1 / 10

Project GabE ECE 135 – Spring 2005 Presentation 10

Project GabE ECE 135 – Spring 2005 Presentation 10. Omar Al-Jadda Adam Durity Rahmin Sarabi. Patrick Crosby. Progress Report. Tested and verified functioning Rx Tested and verified functioning Tx Updated our board design Ordered additional parts Ordered and received second board.

dtaunton
Télécharger la présentation

Project GabE ECE 135 – Spring 2005 Presentation 10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project GabEECE 135 – Spring 2005Presentation 10 Omar Al-Jadda Adam Durity Rahmin Sarabi Patrick Crosby

  2. Progress Report • Tested and verified functioning Rx • Tested and verified functioning Tx • Updated our board design • Ordered additional parts • Ordered and received second board

  3. Gantt Chart

  4. Rx Testing • Test with input from pattern generator • Very good eye pattern 40dB Attenuation 70dB Attenuation

  5. Tx Testing - Conservative 0dB/205ohm 0dB/515ohm

  6. Tx Testing - Aggressive 0dB/810ohm

  7. GabE Board Design 2.0

  8. GabE Board Design 2.0 • Fixed power connector • Changed orientation of VCSEL • Gave the ground plane around the Tx chip more space • Aggressive design strives to achieve LC spacing but violates many design rules

  9. Financial Budget

  10. Upcoming Week • Build GabE Board Design 2.0 • Begin extensive testing of new design • Loopback tests • Attenuation

More Related