1 / 2

QA at AIFIRA, CENBG

QA at AIFIRA, CENBG. QA overview: QA committee: scientific manager, technical manager, technical and PCR staff Accelerator and beamline technical control Log book: accelerator adjustment parameters, comments on the accelerator and beamlines functioning, feedback of the users…

duard
Télécharger la présentation

QA at AIFIRA, CENBG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QA at AIFIRA, CENBG • QA overview: • QA committee: scientific manager, technical manager, technical and PCR staff • Accelerator and beamline technical control • Log book: accelerator adjustment parameters, comments on the accelerator and beamlines functioning, feedback of the users… • Maintenance book: summary of all the interventions on the accelerator and the beamlines after each maintenance • Example of a quality process: Test of all radiation monitoring and safety system after each maintenance • Experiment selection and users’ feedback • PAC every 6 months based on formal user applications : scientific committee with inner, national and international experts (President: G. Grime)  Experiments are discussed with users during the meeting and the potential difficulties are identified • Radiation Safety control: PCR staff presence and security form edition at the beginning of each experiment • Scientific report written by the users after each experiment with a feedback on the eventual issues encountered • Inter-Lab activities • Round robin: We propose a inter-calibration procedure with sectioning cryofixed gelatin gel standard for PIXE (SUR, CNRS, JSI)

  2. Minutes of the last QA meeting: • Accelerator (HVEEE Singletron 3.5 MV): • Energy calibration (90° Magnet) may be scheduled for the second semester : 27Al(p,g)28Si,… • Energy stability: identification of the occasional dysfunction • Upgrade of the GVM (New system + old model fixed) • Main chilling loop of accelerator: additional filters will be added • Beamlines: • Calibration of PIXE detectors (3 detectors) done • Improvement of doublet aligning for the nanobeam • beam resolution enhanced • Thermal drift on sample holder used for the nanobeam fixed • Tomography on nanobeam checked • Upgrade of the irradiation beamline • New version of the control command in progress • Bio Lab : • Completely new 60 m2 L2 laboratory available at CENBG • Previous culture lab available for external users

More Related