Table Top Exercise

Table Top Exercise. Evacuation, Complete or Partial Facility. Tabletop Exercise Introduction. Introduction of players How the exercise will be played Questions and answers. Narrative.

Télécharger la présentation

Table Top Exercise

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Table Top Exercise Evacuation, Complete or Partial Facility

  2. Tabletop Exercise Introduction • Introduction of players • How the exercise will be played • Questions and answers

  3. Narrative • There is a construction project in process at your facility. Upon digging ruptured the operator ruptures the hospital water main, causing your facility’s basement to flood.

  4. Scenario Event 1 • The power to the building has been interrupted.

  5. Scenario Event 2 • Alarms are going off in the ICU.

  6. Scenario Event 3 • Generators are in a flood section of the basement and have been rendered unusable.

  7. Scenario Event 4 • Pharmacy services and the lab have been affected by the flooding.

  8. Scenario Event 5 • The media arrive at the facility and are demanding information

  9. Scenario Event 6 • Family members are calling stating their loved one isn’t answering their phone and demanding to know where they are.

  10. Break 10 minutes Please return promptly

  11. Scenario Event 7 • Several concerned family members are trying to enter through loading doc.

  12. Scenario Event 8 • Several supply areas were damaged by the water, rendering equipment unusable.

  13. Scenario Event 9 • The ruptured pipe has been repaired and should be a full capacity within an hour.

  14. Hot wash • Player’s feedback • Evaluator feedback • Group discussion • Suggestions for improvement