An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CKOV Progress 5-4-07 • PMT Shields completed. Awaiting paint job - @Mississippi. • PMT Enclosures parts @IIT begun (delrin material ordered). • PMT selection at Trieste begun (April). • LED Pulser Electronics and PMT HV Supply in hand. • PMT Base v-1 @ FNAL complete. • CKOV Box Machining to begin @Iowa in May. • CKOV Steele Ordered IIT+Iowa (3wk delivery). • Nickel Plating company in hand. (2 wk turn around • Aerogel Order Placed by Dan. (April) • Aerogel Box dimensions checked- machining in May. • Schott Glass Window Vendor in hand. • Lexan Slumping Oven completed. • Oven Temperature Controller Completed. • Mirror slumping prototype tests completed. • Slumping of MICE prototypes to begin. • Fermilab Mirror coating schedule needs work. Eileen Hahn. • CKOV detectors ~600lb (270Kilo) ea • Fedex OxfordMississippi-OxfordUK ~$1000/500lb CKOV Progress Report, L. Cremaldi, 5-4-07

  2. Back cover Steele frame(down) Steele sides Steele frame(up) front cover front mirrors side mirrors aerogel Schott glass window CKOV Exploded View window frame CKOV Progress Report, L. Cremaldi, 5-4-07

  3. CKOV to Solid Works Translation- Checking • M. Reep has converted all drawings to Solid Works and has performed • dimensional checks. CKOV Progress Report, L. Cremaldi, 5-4-07

  4. Aerogel Compartment • Delrin in hand • Matsushita will slice 6 corner panels  at 45deg. • Machining to begin soon. CKOV Progress Report, L. Cremaldi, 5-4-07

  5. Base Layout V1 - Sten Hansen - FNAL Sten has made first layout and we will begin prototype. Sockets on order. CKOV Progress Report, L. Cremaldi, 5-4-07

  6. CKOV Progress Report, L. Cremaldi, 5-4-07 FiberGlass Oven Enclosure • Simple Fiberglass enclosure with heating elements- D. Summers design. • Lexan Slumping temperature ~ 150C • Temperature controller regulates to +-2 degC. • Preliminary testing finished and bending of MICE prototypes to begin. • Mirroring at FNAL ASAP. CKOV Progress Report, L. Cremaldi, 5-4-07

  7. Commissioning Plan • Plan-A • - Mechanical parts to Mississippi ( June). • Practice Assembly + Light Leak Checking. • Begin shipping to RAL >July 4) • Cremaldi+Sanders to RAL July 15 - Aug 1. • Aerogel Assembly week-1 • Mechanical Assembly and Install week-2 • Plan-B • - Mechanical parts to FNAL ( June). • Practice Assembly + Light Leak Checking. • Begin shipping to RAL >July 4) • Cremaldi+Sanders to RAL July 15 - Aug 1. • Aerogel Assembly week-1 • Mechanical Assembly and Install week-2 CKOV Progress Report, L. Cremaldi, 5-4-07