1 / 21

Robert Putnam, P.E., CH2M HILL Renewable Energy Technical Services Manager Michael Pehosh, P.E., NRECA Principal Distr

To address the key engineering issues that need to be considered before interconnecting wind turbines to electric co-op distribution systemsDiscuss lessons-learned and post-installation operating experience through Cooperative Case Studies. Purpose of this Presentation. Voltage flicker (during

efia
Télécharger la présentation

Robert Putnam, P.E., CH2M HILL Renewable Energy Technical Services Manager Michael Pehosh, P.E., NRECA Principal Distr

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Robert Putnam, P.E., CH2MHILL Renewable Energy Technical Services Manager Michael Pehosh, P.E., NRECA Principal Distribution Engineer,Energy Policy

More Related