LiCAS Project Status. Edward Botcherby, Richard Bingham, Paul Coe, John Green, Grzegorz Grzelak , Ankush Mitra, John Nixon, Armin Reichold, Roman Walczak. (LCUK meeting, QMUL, 5 FEB ’03). Outline. Latest News: LiCAS is now PPRP founded project: 50 k£ (+6k£ travel)

eileen
Télécharger la présentation

LiCAS Project Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LiCAS Project Status Edward Botcherby, Richard Bingham, Paul Coe, John Green, Grzegorz Grzelak, Ankush Mitra, John Nixon, Armin Reichold, Roman Walczak (LCUK meeting, QMUL, 5 FEB ’03) LiCAS Project Status, LCUK Meeting

  2. Outline • Latest News: LiCAS is now PPRP founded project: 50 k£ (+6k£ travel) • Linear Collider Alignment Problem (TESLA) • Proposed Survey Technology • LiCAS Implementation • FSI: Frequency Scanning Interferometry • SM: Straightness Monitor • Recent Progress (FSI,SM, Simulations) • Conclusions/Plans LiCAS Project Status, LCUK Meeting

  3. Survey and Alignment Problem • Tight space (~1m wide) • Many beamlines • Curved tunnel sections • Significant slopes possible • Some sections follows geoid, others are geometrically straight • Temperature and pressure gradients in tunnel • Electrically noisy environment • Induced radiation • Automated measurement needed LiCAS Project Status, LCUK Meeting

  4. Survey and Alignment Problem • TESLA Specification: • 200 mm vertical over 600 meters (=betatron wavelength) • Survey procedure is needed during: • Tunnel construction • Installation of collider components • Accelerator maintenance/repairs • Open air survey too slow and too inaccurate • Need new instrument that matches requirements • ATLAS and ZEUS technologies: FSI and SM developed in Oxford applicable to this problem LiCAS Project Status, LCUK Meeting

  5. Generic Solution • Collider has large number of marker (many lines) • Collider markers are irregular (not good for automation) • Tunnel needs to be surveyed long before collider is installed • Use a two step process • Survey regularly spaced markers in tunnel wall: LiCAS job! • Survey collider components against markers: Second more simple instrument LiCAS Project Status, LCUK Meeting

  6. SM beam internal FSI wall markers external FSI LiCAS technology also applicable to second instrument ! collider component Survey Implementation Tunnel Wall Reconstructed tunnel shapes (relative co-ordinates)

  7. straightness monitors FSI-distance measurements LiCAS Implementation • Mechanical concept of the train developed at DESY • Internal Laser lines (FSI,SM) operate in vacuum • Scalable laser technology (EDFA & TELECOM style infrared lasers) • Prototype @DESY in dedicated test tunnel • Advantages: • Suitable for TESLA and NLC • Operates in inclined and curved tunnels • Higher intrinsic resolution and faster survey • cheaper LiCAS Project Status, LCUK Meeting

  8. IRef time Change of phase: DFRef IGLI time FSI Principle • Interferometric length measurement system • Originally developed at Oxfordfor online alignment of ATLAS SCT tracker • Required measurement precision is 1mm over 5m • Two lasers with opposite tuning direction reduce drift sensitivity (not shown) Tunable Laser Reference Interferometer Length = L Grid Line Interferometer (GLI) Length = D Change of phase: DFGLI LiCAS Project Status, LCUK Meeting

  9. FSI System Amplitude Modulation @ f1 C-Band Amplifier (1520-1570) Laser 1 f1 L-Band Amplifier (1572-1630) Laser 2 f2 Amplitude Modulation @ f2 Reference Interferometer Splitter Tree piezo detector Quill Demodulator @ f1 , F1 Amplifier Amplifier ADC 2MHz ADC 2MHZ Detectors Demodulator @ f2 , F1 Retro Reflector Buffer Memory GLI USB-2 Readout Amplifier ADC20MHZ Demodulator @ f2 , F1 Readout Board LiCAS Project Status, LCUK Meeting

  10. New Lasers • increased continuous, mode hop free fine tuning range by factor 300 (0.24nm to 130nm) or (100GHz @ 850nm to 16THz @ 1500nm) • increased total tuning range by factor 8 from 16nm to 130nm • increase fine tuning speed by factor 3000 (100GHz/min to 5 THz/sec) or (0.24nm/sec @ 850nm to 40nm/sec @ 1500nm) • Erbium doped fibre amplifiers as inexpensive, scalable sources of laser power (100 mW per EDFA) • telecommunication fibres and accessories much cheaper than components at 850nm LiCAS Project Status, LCUK Meeting

  11. Recent Developments • Selected and commissioned LiCAS laser • Set-up first LiCAS FSI interferometer • Simultaneous transmission and readout of two lasers in the same interferometer • Designed two FSI collimation systems (reflective and refractive) • Designed two collimation systems for SM and implemented one • Designed two reduction optics for SM and implemented one • Complete demonstration prototype of SM constructed (laser, collimation optic, reduction optic, camera, frame grabber, software) • Two optical simulation packages (OPTICA, ZEMAX) • Geometrical simulations of LiCAS performances • Fully equipped laboratory from online auctions of telecoms insolvencies LiCAS Project Status, LCUK Meeting

  12. 15% mod. Volts 15% mod. Time Volts Time Recent Developments • Amplitude Modulation on FSI fringe • @ 40 & 80 kHz (now) 0.5 & 1MHz (later) • High Pass Filter • FSI fringe stored as amplitude on • Carrier (a’la AM radio) • Demodulation reproduces FSI Fringes LiCAS Project Status, LCUK Meeting

  13. l2 wavelength l1 M1 time Amplitude Modulation @ f1 M2 Laser 1 Volts Laser 2 Demodulator @ f1 , F1 Detector Amplitude Modulation @ f2 l2 time wavelength Volts Demodulator @ f2 , F1 l0 time time Recent Developments t0 t1 f1 f2 t0 t1 LiCAS Project Status, LCUK Meeting

  14. CCD 1 2) CCD 2 y y z z Straightness Monitor Two beams shown • Two parallel laser beams • Low coherence length diode laser to avoid interference on CCD • Two possible splitter configurations 1) • Measure transverse translations • Need 1mm precision over length of train • 1:10 demagnification optics to increase dynamic range  0.1 mm CCD resolution • Measure rotations around x and y axis One beam shown in Configuration 1) Rotation: Spots move opposite directions Translation: Spots move same direction

  15. y y z x Straightness Monitors Use two parallel beams to measure rotation about z-axis SM beams coming out of the screen Image of beam spots observed on CCD Camera LiCAS Project Status, LCUK Meeting

  16. SM: Results Basic SM optics has been set-up. Fitted Gaussian to camera image Camera looking at low-coherence laser LiCAS Project Status, LCUK Meeting

  17. Simulations: single train without clinometer (SIMULGEO package developed by L. Brunel for CMS) • FSI resolution: 1 mm • SM CCD resolution 0.01 mm (unrealistic !) • Problem: weak measurement of rotation around z-axis  small separation between two beams on CCD LiCAS Project Status, LCUK Meeting

  18. Simulations: single train + 1-Axis Clinometer • FSI resolution 1 mm • SM CCD resolution 0.1 mm • Clinometer resolution 1 mrad •  much better precision for Y-coordinate of wall markers LiCAS Project Status, LCUK Meeting

  19. Hard Requirements  need good point accuracy ! Simulation over 600 m  input for beam dynamics simulations LiCAS Project Status, LCUK Meeting

  20. Conclusions/Plans • Modern Survey Approach • Using the latest achievements developed for ATLAS and ZEUS • General Purpose Alignment System (TESLA/FEL, NLC, …) • Cost effective solution (TELECOM lasers, fibre amplifiers) • New LAB in Oxford, many new developments in progress • Man Power: 6 FTE in 2003 • Collaboration with DESY: • Test the prototype in dedicated tunnel in DESY • First application of the system: X-FEL (2005 -> in 2 years !) LiCAS Project Status, LCUK Meeting