Operational planning with Control System DRY RUNS

Operational planning with Control System DRY RUNS. Claude Dehavay Thanks to inputs from Marine & Marc . BE-CO Dry run in the Injector schedule. 5 working days Period. MONDAY. TUESDAY. WEDNESDAY. THURSDAY. FRIDAY. AM. PM. AM. PM. AM. PM. AM. PM. AM. PM. Preparation 1.

elaine
Télécharger la présentation

Operational planning with Control System DRY RUNS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operational planning with Control System DRY RUNS Claude Dehavay Thanks to inputs from Marine & Marc

  2. BE-CO Dry run in the Injector schedule 5 working days Period MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY AM PM AM PM AM PM AM PM AM PM Preparation 1 BE-CO Test 1 Debriefing/Debugging/Consolidation Preparation 2 BE-CO Test 2 Debriefing Week 7, 8 + 10: individual EIS tests Week 11 & week 14: global EIS tests -> all EIS available

  3. Planning Dry Runs (PSB – Uncomplete)

  4. Planning Dry Runs (Uncomplete)

  5. Planning for CPS (Uncomplete)

  6. BE-CO roles during the Dry Run 5 working days Period MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY AM PM AM PM AM PM AM PM AM PM Preparation 1 BE-CO Test 1 Debriefing/Debugging/Consolidation Preparation 2 BE-CO Test 2 Debriefing + ACCOR Project Leader

  7. BE-CO Roles & Experts (to be completed)

  8. Final remarks • CO, OP &EQP close collaboration required • Dry Run (DR) planning to be now consolidated and refined with EQP groups + OP • Need to anticipate DR in HWTESTS as Cold Check Out (CCO) period too short • List of checks during CCO to be defined by OP • Organizationof DR: Same as for pilot DR: wiki + Jira issues for each pre-requisite + each check