An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. BMA CHILLER UPGRADE PROJECT

    2. CURRENT BMA FACILITY

    3. CURRENT BMA FACILITY

    4. HISTORY Before 1994 Chiller water was purchased from JHU After 1994 480 ton ice thermal storage system 215 ton screw chiller Backup connection to JHU for chiller water 695 ton capacity with peak demand of 720 ton

    5. PLANNING TIMELINE Doreen walkthroughDoreen walkthrough

    6. CHILLER PLANT AFTER THE PROJECT Chiller water capacity 600 ton centrifugal chiller 480 ton ice machine 215 ton screw chiller Free cooling capacity during winter. A new temporary chiller connection port for hook up.

    7. Project budget 1.9 million Actual cost 1.76 million Duration 12 month

    8. ELECTRICITY SAVINGS