1 / 25

Fanning Outdoor Recreation Facility

Fanning Outdoor Recreation Facility. Conceptual Plan Final report (draft) Presented by Stan Kochanoff & Tracey Tomlik. Stakeholders The Strait Regional School Board The NS Department of Health & Protection The Municipality of Guysborough Preliminary ‘shopping list’ 8km trail loop

elmer
Télécharger la présentation

Fanning Outdoor Recreation Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fanning Outdoor Recreation Facility Conceptual Plan Final report (draft) Presented by Stan Kochanoff & Tracey Tomlik

  2. Stakeholders • The Strait Regional School Board • The NS Department of Health & Protection • The Municipality of Guysborough • Preliminary ‘shopping list’ • 8km trail loop • Campsites • Outdoor classroom & shelter • Low ropes initiative course • Bird Blind • Interpretive signage • Access route to Lake & Canoe launch area

  3. Final Report • Conceptual Plan • Showing in plan view where design elements are located • Three Phased developmental approach • Organizing design elements into four separate projects • Cost Estimates • Presenting expected cost associated with each design element

  4. Bird Observation • 8km Trail • Group Campsites • Tree-Go • Outdoor Classroom • Teaching Garden • Soccer Field • Walking Track • Green Gym • Access Road • Canoe Launch

  5. Phase One • Establishing a Trail system • Two group campsites • Interpretive signage • Regulation Soccer Field • Access Road/ Turning circle & parking • Canoe launch site • Total Cost • $82,374 - 95,824

  6. Establishing a Trail System • 8kms of trail • Yellow route (1km) • Blue route (2km) • Red route (5km) • 8kms of trail • $2,500/km • Total • $20,000

  7. Group Campsites (2) • (1) family camping • Trail ($625) • Picnic tables (2@$150) • Fire pit (2@$100) • Waste bins (2@$125) • (2) Wilderness camping • Trail ($750) • Fire pit ($100) • Total • $ 2,225 1 2 1

  8. Interpretive Signage • Wooden signs • Describing local ecology • Showing direction • Cost Estimate • 3 Large ($1,500) • 15 Small ($50 - 100) • Total • $5,250 - 6,000

  9. Soccer Field (300 x 180ft) Extension $15 - 20,000 Bleachers ($4,800) Benches ($600) Nets ($5,300) Fencing (behind nets) $14,400 Total $32,900 - 45,100 Annual Maintenance Lime (20lb/1000sqft) $135 Fertilizer (10lbs/1000sqft) $259 Aeration $480 Total $874

  10. Lake Access Road • Expanding the current path to 11ft wide • Cost Estimate • Excavating • $810 • Class A Gravel • $6,480 • Ditching • $4,500 • Total • $11,790

  11. Turning point & temporary parking • 35ft Radius • 2@20x10 parking spots • Cost Estimate • Fill • $1,180 • Excavating • $295 • Class A Gravel • $2,360 • Total • $3,835

  12. Canoe Launch Site • Clearing rocks to create a launching site • Constructing a dry dock • Cost Estimate • Lake dragging ($3,000) • Dock ($2,500-3,000) • Total • $ 5,500 - 6,000

  13. Phase Two • Bird Observation • Outdoor classroom shelter • Teaching garden • Tree Plantings • Total Cost • $40,524 - $45,524

  14. Bird Observation Tower • An offshoot of the yellow hiking trail • 0.3km ($750) • Observation platform • 256sqft footprint • $12 - 15,000 • Total • $ 12,750 - 15,750

  15. Outdoor classroom • Shelter with no walls • 1,600sqft • Long table with benches • Location is flexible right now • Cost Estimate • Excavating ($90) • Class A gravel ($720) • Materials • $8 - 10,000 • Total • $8,810 - 10,810

  16. Two possible locations

  17. Teaching garden (900sqft) • Food production • Wildlife habitat • Cost Estimate • Excavating ($50) • Soil ($200) • Compost ($250) • Gravel ($120) • Fence ($9,100) • Total • $9,720 * Excluding the cost of plant material

  18. Tree Plantings • Soccer Field (10) • Playground (3) • Grassed slope (9) • Cost Estimate • 5ft Evergreen • $368 (8) • 60mm Deciduous • $450 (14) • Total • $9,244

  19. Phase Three • Walking Track • Green Gym Outdoor Fitness Centre • Aerial Adventure Course (Tree-Go) • Total Cost • $74,235 - $84,235

  20. Walking Track • Located on the perimeter of the soccer field • Walking & jogging for all ages • Cost Estimate • Excavation • $335 • Track base (67cuyd) • Crusher dust ($3,900) • Total • $4,235

  21. Outdoor Gym system • Green Gym (5units) • Stations placed along walking track • One designated area • Total • $20,000

  22. Aerial adventure course • Tree-Go unit • Demo Area • Kids Area • Main Course • >10” Trees or use poles • Total • $50,000 - 60,000

  23. Phase 1 $82,374 - 95,824 Phase 2 $40,524 - 45,524 Phase 3 $74,325 - 84,325 Total Cost Estimate $197,223 - 225,583 Summary Presentation Final Plan (draft) Cost Estimate Public Feedback Questions or concerns Discussions

  24. We Thank You for your Feedback

More Related