LHC-LS2 Coordination Meeting: Safety, Planning, and Baseline Changes

This is the agenda for the LHC-LS2 Coordination Meeting, discussing safety, planning, and baseline changes. It includes important dates, access constraints, and updates on various tasks and activities.

elsiem
Télécharger la présentation

LHC-LS2 Coordination Meeting: Safety, Planning, and Baseline Changes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHC - LS2 2018-2021Coordination meeting #49 3rd September, 2019 AGENDA: Safety point LHC-LS2 planning Marzia Bernardini, Julie Coupard, Michela Pirozzi, Estrella Vergara LHC coordination meeting

  2. LHC-LS2 Coordination • Piquet’s phone number: 161669 • INDICO: https://indico.cern.ch/category/7200/ (LHC-LS2) • OSS website (planning, constraints, useful links…):https://lhc-coordination.web.cern.ch/ • LS2 Plannings (all accelerators) • LS2 Access constraints • LS2 Baseline EDMS 1817804 LHC coordination meeting

  3. News and questions LS2 days: 8th and 9th October 2019 See agenda LHC- NEW LS2 linear baseline must be ready by 15th September at latest. This includes the EQUIPEMENT readiness.Presentation at the LS2Committe on Friday 20thSeptember LSS7 : RR73, RR77 racks removal with respect to cabling campaign? LHC coordination meeting

  4. The Frame: wherewe are LHC coordination meeting

  5. LHC-LS2 Baseline main changes (wrt actual Baseline) EN-CV maintenance in P18  from 16th to 24th April 2019 EN-EL: General re-organization of cable campaign: Fibre Optical campaign, Powering cables campaigns Transformers replacement Access constraints related to electrical maintenance EN-HE: PM65 no lift replacement; PX15: additional new lift replacement Mafi line in S.78? EN-SMM: smoothing@cold (date TBC) DISMAC & Magnets exchange No changes for opening, consolidation, closure and leak tests Changes for CC in LSS2 and 11T planning installation and readiness dates Consolidation of Q16L2 and C16L2 HL-LHC: WP11 11T infrastructure installation compatible with both configuration HL-LHC: WP17 UPR opening for HL HL-LHC: aCcoating Q5R2, Q6R2, Q6L8 TE-CRG & TE-VSC: QRL leak in s.1-2 TE-VSC: RF ball EP : FASER BE-ICS: LACS consolidation LHC coordination meeting

  6. LHC-LS2 Baseline main changes (wrt actual Baseline) LSS1: AFP activities EN-STI: Wire collimators exchange (new task) LSS2 : MKI readiness date TCLIA? LSS4: ACS module replacement (new task) BE-BI: Wire Scanner and BSRT LSS5: EN-STI: Wire collimators swap (new task) TOTEM activities wrt LSS5 Alignment LSS6 MKD maintenance BE-BI : The completion of the new LHC BPM interlock electronics in LSS6 need to be delayed to May 2020. This will require limited tunnel access, but has no impact on beamline or vacuum activities. All LSS-> EN-SMM Monitoring system consolidation LHC coordination meeting

  7. LHC-LS2 EN-EL Maintenance (EDMS ELG-ADMIN-QE-0033 V.21 ) LHC coordination meeting * NO ACCESS in SURFACE and UNDERGROUNG (Guardian at the point entrance)

  8. Access constraintsduring EL-Maintenance edmsLHC-L-PRD-0002 LHC coordination meeting

  9. LHC-LS2 EN-CV Maintenance LHC coordination meeting

  10. LHC P4 LHC coordination meeting

  11. ACS module replacement LHC coordination meeting

  12. LSS5L-LSS5R LHC coordination meeting

  13. TOTEM LHC coordination meeting

  14. LHC Access Constraint overviewW35-W36, 2019 LHC coordination meeting

  15. Week 36 2019 - P1 + Sector 1-2 + P2 + Sector 2-3 LHC coordination meeting

  16. Week 36 2019 - P3 + Sector 3-4 + P4 + Sector 4-5 LHC coordination meeting

  17. Week 36 2019 - P5 + Sector 5-6 + P6 + Sector 6-7 LHC coordination meeting

  18. Week 36 2019 - P7 + Sector 7-8 + P8 + Sector 8-1 LHC coordination meeting

  19. Week 37 2019 - P1 + Sector 1-2 + P2 + Sector 2-3 LHC coordination meeting

  20. Week 37 2019 - P3 + Sector 3-4 + P4 + Sector 4-5 LHC coordination meeting

  21. Week 37 2019 - P5 + Sector 5-6 + P6 + Sector 6-7 LHC coordination meeting

  22. Week 37 2019 - P7 + Sector 7-8 + P8 + Sector 8-1 LHC coordination meeting

  23. Next meetings https://indico.cern.ch/category/7200/ W38: 17th September LS2 coordination meeting #50 • Safety point • LS2 new baseline for LHC • LS2 planning overview W39: 24th September LS2 coordination meeting #51 • Safety point • LS2 planning overview W40: 1st October LS2 coordination meeting #52 • Safety point • LS2 DETAILED planning LS2 days: 8th and 9th October 2019 LHC coordination meeting

  24. Back-Up slides LHC coordination meeting

  25. LHC Planning overview – service areas LHC coordination meeting

  26. LHC P1+ P18 LHC coordination meeting

  27. LHC P2 LHC coordination meeting

  28. LHC P3 LHC coordination meeting

  29. LHC P4 LHC coordination meeting

  30. LHC P5 LHC coordination meeting

  31. LHC P6 LHC coordination meeting

  32. LHC P7 LHC coordination meeting

  33. LHC P8 LHC coordination meeting

  34. LHC Planning overview – LSSs LHC coordination meeting

  35. LSS1L-LSS1R LHC coordination meeting

  36. LSS2L-LSS2R LHC coordination meeting

  37. TI2 LHC coordination meeting

  38. LSS4L-LSS4R LHC coordination meeting

  39. LSS5L LHC coordination meeting

  40. LSS5R LHC coordination meeting

  41. TOTEM – EN-SMM – TE-VSC LHC coordination meeting

  42. LSS6L-LSS6R LHC coordination meeting

  43. LSS7L – LSS7R LHC coordination meeting

  44. LSS8L-LSS8R LHC coordination meeting

  45. TI8 LHC coordination meeting

  46. LHC Planning overview – Arcs LHC coordination meeting

  47. Arc 8-1 LHC coordination meeting

  48. Arc 8-1: DISMAC LHC coordination meeting

  49. RR13 LHC coordination meeting

  50. RR17 LHC coordination meeting