1 / 11

Terrestrial and Satellite Sharing Panel Discussion NSMA Annual Conference

Terrestrial and Satellite Sharing Panel Discussion NSMA Annual Conference Moderator - Ken Ryan, Comsearch 5/23/01 Rosslyn, VA. Satellite and Terrestrial Sharing. Tom Stanley – Chief Engineer, Policy Division, Wireless Telecommunications Bureau

emile
Télécharger la présentation

Terrestrial and Satellite Sharing Panel Discussion NSMA Annual Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Terrestrial and Satellite Sharing Panel Discussion NSMA Annual Conference Moderator - Ken Ryan, Comsearch 5/23/01 Rosslyn, VA

  2. Satellite and Terrestrial Sharing Tom Stanley – Chief Engineer, Policy Division, Wireless Telecommunications Bureau Ron Repasi – Chief, Satellite Engineering Branch, International Bureau Karis Hastings – Hogan & Hartson, Representing the Satellite Industry Association Ron Coles – Director, Regulatory Affairs & Government Relations, DMC Stratex Networks, Representing the Fixed Wireless Coalition Committee

  3. Summary of the Main Issues? • Satellite Earth Stations typically coordinate full band access • Earth Stations coordinate for full-arc access creating a worst-case horizon gain • First-in-time rights generally apply when coordinating new paths and earth stations • RFI and shielding data used to resolve interference cases into earth stations not available to FS operators trying to coordinate new paths • If an interference case exists into an earth station the FS operator often finds it too expensive and time consuming to pursue a detailed resolution effort

  4. Recent FCC Actions • FWCC “Full-band, Full-Arc” Petition NPRM IB Docket 00-203 • NGSO-FSS Ku-band Report and Order ET Docket 98-206

  5. IB Docket 00-203: FWCC Petition • Fixed Wireless Communication Coalition Petition on Partial-Band Licensing of FSS Earth Stations • Require, after being licensed for 24 months if an FSS denies an FS coordination, that the FSS demonstrate that the FSS E/S is using, has recently used, or has imminent plans to use the requested spectrum • If FSS cannot show such use then FS can take frequencies and be afforded full protection rights • Coordinators would maintain band usage data

  6. IB Docket 00-203: FWCC Petition • E/S Stations using less than 40 MHz exempt • Shorten loading period for FS licensees in shared C and Ku-band from 30 to 24 months • Asks for comment on applying this loading requirement to other shared FSS-FS bands • Require FSS E/S accepting a particular interference analysis model during coordination accept use of same model for subsequent coordinations • Require C or Ku-band FSS E/S that has accepted interference on a set of azimuths not claim protection along same azimuth for same frequency during subsequent coordinations

  7. ET Docket No. 98-206: Summary • Amendment of Rules to Permit NGSO FSS Systems in the Ku-band • Amendment of Rules to Authorize Subsidiary Terrestrial Use of the 12.2-12.7 GHz

  8. ET Docket No. 98-206: Summary • NGSO FSS Gateway Earth Station Bands • Gateway E/S Downlink Band 10.7-11.7 GHz • NGSO Downlink PFD Limits • Gateway E/S - FS Sharing and Coordination • GSO Operations in NGSO Gateway Downlink Band • NGSO/GSO Band Sharing EPFD Limits • NGSO Gateway E/S Uplink Band 12.75-13.25 GHz • NGSO Gateway ES Uplink Band 13.75 - 14.5 GHz • NGSO Service Link Bands • NGSO Service Link Downlink Band 11.7-12.2 GHz • NGSO Service Link Downlink Band 12.2-12.7 GHz • NGSO Service Link Uplink Band 14.0-14.4 GHz • NGSO/GSO Band Sharing EPFD Limits

  9. ET Docket 98-206: 10.7 - 11.7 GHz Band • Only Gateway NGSO FSS Earth Stations in Band • Part 25 and 101 Coordination Required • NSMA Encouraged to Examine NSGO E/S Coordination Rules • Mandatory Site Shielding Not Required • Growth Zones Will Be Addressed in Separate Proceeding but are likely • GSO to Remain for International Use Only in 10.7-11.7 GHz band • NGSO Downlink EPFD Limits Set

  10. What Can be Done? • Develop the ability to store and easily forward site blockage/RFI measurement data between coordinators • Accommodate single channel FS links • Resolve interference conflicts quickly • Follow sound engineering/coordination practices • Work within the NSMA

More Related