An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Grid Corporation of India Limited An overview… OS deptt., POWERGRID

  2. Areas of Operation Grid Management Telecom Consultancy National & International Development of Central Sector Transmission System • Generation Linked • Grid Strengthening • Inter-regional links • International links • Estb. of modern Load Despatch Centres • Real-time Grid Operation • Optimum scheduling & despatch • Owns & Operate Fibre optic cable network • Licenses - IP-I, ISP and NLDO • Transmission • Load Dispatch & Communication • Distribution • Telecom OS deptt., POWERGRID

  3. POWERGRID – A snapshot As on 01.09.07 Carries 42 - 45% of India’s power Network availability > 99% (99.66%) OS deptt., POWERGRID

  4. Major Elements

  5. Asset classification • Internally - 8 Regions with RHQs at • NR-I, Delhi • NR-II, Jammu • ER-I, Patna • ER-II, Kolkata • WR-I, Nagpur • WR-II, Vadodara • SR-I, Hyderabad • SR-II, Bangalore • NER, Shillong • For tariff purpose – 5 regions • ( NR, ER, WR, SR & NER )

  6. Reduced grid disturbances • No major grid disturbance in last 4½ years • Transmission losses 3-4% in line with international standards

  7. Physical performance Transmission network addition (Ckt Kms) (2002-03 to 2006-07) (2007-08 to 2011-12) (1997-98 to 2001-02)

  8. Physical performance Sub-stations Addition (Nos.) (2007-08 to 2011-12) (2002-03 to 2006-07) (1997-98 to 2001-02)

  9. Capital expenditure (2007-08 to 2011-12) (1997-98 to 2001-02) (2002-03 to 2006-07)

  10. Monitored Performance Parameters of Transmission System • Availability • Availability of the transmission system • Reliability • No. of trippings per line attributable to POWERGRID

  11. Performance of the transmission system during against MoU target

  12. No. of tripping / line - MOU Target Vs Actual(Reliability factor )

  13. Capacity Addition Programme (MW) -XI Plan Ultra Mega Power projects (UMPP) of about 12000 MW is also envisaged Source: Ministry of Power (May’07)

  14. XI PLAN INVESTMENT PROGRAMME • An investment of about Rs. 55,000 Crore is estimated by POWERGRID covering more than 115 no. of projects/ schemes

  15. Proposed Funding for XI Plan IEBR for XI Plan, considering IPO, sale of securitised bonds is summarized as under:

  16. Plan wise Performance

  17. PHYSICAL PERFORMANCE Transmission network addition (Ckt Kms) (2002-03 to 2006-07) (2007-08 to 2011-12) (1997-98 to 2001-02)

  18. PHYSICAL PERFORMANCE Sub-stations Addition (Nos.) (2007-08 to 2011-12) (2002-03 to 2006-07) (1997-98 to 2001-02)

  19. CAPITAL EXPENDITURE (2007-08 to 2011-12) (1997-98 to 2001-02) (2002-03 to 2006-07)

  20. FINANCIAL PERFORMANCE • Excellent growth achieved despite downward revision in tariff norms • by CERC

  21. BEYOND XI PLAN • Power scenario: • National Grid capacity : 1,50,000 MW by 2027 • Investment requirement for POWERGRID by 2027: Rs. 6,000 Billion

  22. COMPARISION OF BANGALORE VOLTAGE ON TYPICAL DAYSIN LAST FOUR YEARS 420 2005 2003 400 380 2004 360 VOLTAGE IN KV ---> 340 320 2002 300 0:01 1:01 2:01 3:01 5:01 6:01 7:01 8:01 9:01 4:01 21:01 23:01 20:01 22:01 18:01 19:01 14:01 15:01 16:01 17:01 10:01 11:01 12:01 13:01 TIME IN HRS ---> ImprovedSystem Performance PERCENTAGE OF TIME FREQUENCY IN NORMAL BAND (49.0-50.5 Hz) 100.00 90.00 80.00 70.00 60.00 50.00 % OF TIME Post Sync. Of POST ABT / 40.00 Central Grids i.e. PRE ABT / ULDC ULDC NR, ER & WR, NER 30.00 20.00 10.00 0.00 YEAR 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2006-07 upto Aug'06 NorthernRegion Western Region Southern Region Eastern Region COMPARISON OF BANGALORE VOLTAGE ON TYPICAL DAYS IN LAST 4 YEARS

  23. FACILITATING PRIVATE PARTICIPATION • First Joint Venture (JV) project with M/s. TATA POWER successfully completed - Rs. 1,600 Crore • Commissioning of the project signifies the success story of Public-Private Partnership in Indian Power Sector. • This public-private participation model has been supported by premier institutions like IFC, ADB, SBI & IDFC. IFC appreciated the model in following words, “This is a unique model of public-private participation that has the potential for replication in India and abroad”

  24. FACILITATING PRIVATE PARTICIPATION • JVs under finalisation - • Signed MoUs with Five Independent Power Producers at Rs. 5000 Crore • Formed JVs with Torrent Power Ltd and Jaiprakash Hydro Ltd. (Rs. 1,300 Crore) • Koldam and Parbati transmission system at Rs. 660 Crore • Independent Power Transmission Company (IPTC) route • Part of Western Region Strengthening Scheme – II (Rs. 1600 Crore) through 100% private participation – bids under evaluation

  25. BUSINESS DEVELOPMENT • Strengths • In-house expertise in Planning, Engineering, Telecommunication, Load Despatch & Communication, Distribution, Sub-transmission, Contracting, Finance and Project Management • Providing Consultancy services to Power/ Telecom Utilities in India and at International level • Growth in Consultancy revenue:

  26. ROLE IN DISTRIBUTION REFORMS • Accelerated Power Distribution & Reforms Programme (APDRP): • Advisor-cum-Consultant (AcC) in 18 States spread over 178 distribution circles/ towns/ schemes costing about Rs. 7,450 Crore • Implementing network expansion and strengthening schemes of about Rs. 1,315 Crore on behalf of 7 States - Bihar, Goa, Uttar Pradesh, Gujarat, Meghalaya, Tripura and Mizoram on deposit work basis under bilateral arrangement. • Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY): • Implementing rural electrification projects in 9 States involving 88,300 villages with a total Project cost of Rs. 9,400 Crore. • POWERGRID’s share in total rural electrification work of the country is a major 30%. In 2006-07, POWERGRID successfully created infrastructure for electrification of 14,640 no. of villages, out of country-wide achievement of 40,000 villages.

  27. TRANSPARENT POLICIES & PROCEDURES • Well defined “Works & Procurement Policy and Procedures (WPP)”, for both pre-Award and post-Award activities, in place to facilitate quick decision making. • Well defined “Delegation of Power” in place to empower officers at various levels • Developed Systems & Procedure Manuals for most of the functional areas like Construction, O&M, Human Resource, Quality etc. • Committees of Independent eminent experts for advising POWERGRID on various issues like, Research & Development, Upgradation of ESPP document and environment compliance assessment, Telecom, Financial Management, etc. • Online Complaint Handling system on website.

  28. TOWARDSGREENENVIRONMENT • POWERGRID is the first PSU in Power Sector to develop “Environmental and Social Policy & Procedures (ESPP)”through public consultation with various stake holders. • Based on the principles of Avoidance, Minimization and Mitigation. • Widely appreciated by various funding agencies like The World Bank, ADB etc. • Total Forest involvement reduced from 6% to 2% • Implementation of projects without any rehabilitation and resettlement disputes. • In recognition to outstanding contribution, The World Bank awarded Green Award 2006

  29. Delegation of Powers to Board of Directors as MINIRATNA PSU Investment approval • Investment approval of a project costing upto Rs. 500 Crore Formation of JVs & Subsidiaries • Equity investment in JVs and subsidiaries up to 15 % of Networth in one project limited to Rs. 500 Crore. • Overall ceiling of equity in all projects - 30% of Networth.

  30. XI Plan – Major Projects • Generation linked schemes : Barh, Sipat I, Kahalgaon II, PH I, Korba III, Farakka III, Kawas II, Gandhar II, Koldam, Subansiri, kameng, Parbati III, Chamera III, Rampur, Power Evacuation from Sikkim projects, Neyveli II, Kaiga 3 &4, RAPP 5&6, Kudamkulam APP, Kalpakkam, Ultra mega Projects etc. • Grid strengthening schemes: Strengthening schemes in Western, Eastern, Northern regions. • Inter –regional Schemes : To enhance the inter-regional capacity to about 40,000 MW. • National Load Dispatch Centre

  31. MANPOWER GROWTH Average Growth in manpower 1.4% p.a corresponding to about 50% growth p.a. in Asset base

  32. Investment Approval by GoI • Appraisal by GoI if project cost > Rs. 500 Cr. • Prior approval under Sec. 68 of EA, 2003 • Approval of FR/RCE from Management • Submission of FR cum DPR to MoP along with draft PIB note & checklist • Recommendation of Public Investment Board (PIB) • Approval by Cabinet Committee on Economic Affairs (CCEA)

  33. Project Approved (24 weeks) POWERGRID to prepare FR and submit Draft PIB memo & DPR complete as per check list to MoP CCEA meeting and issue of minutes of CCEA Typical flow chart for approval of a project (Legend: AA-Appraising Agencies, MoP-Ministry of Power) 2 Weeks Submission of proposal by MoP to Cabinet Secretariat for its consideration by CCEA MoP to circulate DPR & draft PIB memo to Plang Commission/Concerned Min./ Appraising Agencies (AA) Zero Date 3 Weeks Comments on draft CCEA Note by different Ministries/ Departments with approval of concerned Minister Comments on Draft PIB memo by Planning Commission/AA 2 Weeks 5 Weeks MoP to circulate final PIB memo after incorporating comments issued by Plan. Comm/ Concern Ministries/ (AA) Preparation & Circulation of CCEA Note 4 Weeks 2 Weeks Issuing Minutes of PIB meting Convening PIB meeting 2 Weeks 4 Weeks

  34. DIVERSIFICATION IN TELECOM • Total Network Planned – 20,000 KM. covering 60 cities • Project cost: Rs. 1,000 Crore • Most of the planned Telecom Network already installed; connectivity provided to all metros, major cities & towns including NE and J&K • POWERGRID is one of the few telecom players with a marked presence in remote areas of the country. • Providing bandwidth capacity to major telecom players.

  35. PERFORMANCE DURING FY 2006-07 Laurels • Since 1993-94, continuously rated “Excellent” for performance against Memorandum of Understanding (MoU) with MoP • “MoU Excellence Award” for 6 FYs: • 2005-06, 2004-05, 2003-04,2000-01, 1999-2000 and 1998-99. • “Scope Award for Excellence and Outstanding Contribution to the Public Sector Management” conferred on Dr. R. P. Singh, CMD, POWERGRID for the year 2005-06 • “National Awards for Meritorious Performance” in construction and operation during 2004-05 & 2005-06 (4 Gold shields and a silver shield ).

  36. Corporate Planning Roles and Responsibilities • Single window co-ordination with external agencies • Preparation of the Strategic Plan for the Company • Funds tie-up from Multi Lateral Funding agencies (WB,ADB, JBIC etc.) • Co-ordination with Finance/ Engg./ Contracts departments for proper resource allocation to various projects • Ensure expeditious investment approval from appropriate authority

  37. Human Resource Development • Emphasis on integrated development of employees • Suitable budget allocation since we treat training as an investment • at least 1.5% of salary budget; can go upto 5% • Competency mapping at Sr. levels • right person at the right job • Capitalise on individual strengths and development of teams • An annual asset growth rate of about 50% has been achieved against a meager manpower growth of 1.4% per annum.

  38. POWERGRIDS RESPONSE TO SOCIAL CAUSES • Evolved most effective Disaster Management System to minimize the impact of natural calamities like floods, cyclones, Earthquake etc. • Quick restoration of power supply through Emergency Restoration System • Gujarat cyclone in 1998, restored within a week • Orissa Cyclone in October, 1999, restored within 11 days • Gujarat earthquake in January, 2001 • Restored power supply within one week • Reconstructed 10 damaged Sub-stations within a record time of 3 months, dedicated to the Nation by the Hon’ble Prime Minister • Restoration work in Andaman after Tsunami • Tower collapse in Delhi & Karnataka • Employees contribution during Earthquake in Kashmir

  39. Approval by BoD APPROVAL OF REVISED COST ESTIMATE RCE Cost  Rs. 500 Cr Yes No COD on RCEs No Yes First RCE, Variation entirely due to change in allowable fiscal factors within PTC Variation from 10-20%after excluding allowable fiscal factor within PTC Variation>20%after excluding allowable fiscal factor within PTC <5% of the latest approved cost excluding fiscal factor within PTC Variation upto 10% after excluding allowable fiscal factor within PTC >5% of the latest approved cost excluding fiscal factor within PTC Shall be appraised by PC and approval by MP & FM Shall be appraised by PIB & approval by CCEA Shall be appraised by PIB & approval by CCEA Shall be appraised by PC and approved by MP Shall be approved by MP in consultation with PC BoD – Board of Directors , COD – Committee of Directors, PC - Planning Commission, PTC – Project Time Cycle, MP – Minister of Power, FM – Minister of Finance, PIB – Public Investment Board CCEA – Cabinet Committee on Economic Affairs,

  40. TRANSPARENT POLICIES & PROCEDURES Benefits: • Effective & efficient systems & procedures in place • Facilitating quick and effective decision making through empowerment • Commissioning of projects within schedule or ahead of schedule • Minimal Contractual disputes • Efficient dealing of statutory requirements like environment issues, audit issues etc. • Minimizing adverse comments from external auditing agencies. • Minimising public contact. • Increasing confidence of stake holders.