1 / 29

Construction Claims By Raya Jaber Tasnim Bany Jaber Tala Aydi

Construction Claims By Raya Jaber Tasnim Bany Jaber Tala Aydi Supervisor: Eng. Mohammad abu neama. Outline. Introduction. Managing construction projects with standards and specifications plays a fundamental role in construction projects.

enoch
Télécharger la présentation

Construction Claims By Raya Jaber Tasnim Bany Jaber Tala Aydi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Claims By Raya Jaber TasnimBanyJaber TalaAydi Supervisor: Eng. Mohammad abuneama

  2. Outline

  3. Introduction Managing construction projects with standards and specifications plays a fundamental role in construction projects. Expectations of parties may be disappointing and disputes may arise at any time between the first bid and the last bill of the project.

  4. Definition construction claims are defined as a request from one party to another for adjustment because of change under the contract terms. Parties involved in construction claims are, owner, contractor and designer.

  5. Resolve Construction Claims

  6. Statement of the problem Construction projects in Palestine suffer from many problems, which result in extension beyond budget and time. Because of these problems, construction claims occur. In this project, an identification of the most important causes of construction claims were determined in order to avoid them.

  7. Project objectives • Determination of the impact of claims on construction which are time, cost and quality in Palestine. • Identification of the party that is responsible for each cause. • Identification the most important causes of issuing construction claims in Palestine.

  8. Methodology

  9. Data Analysis In order to achieve the project objectives, data was collected and analyzed using likert scale and Microsoft Office Excel.

  10. Questionnaire • Questionnaire template was prepared as a part of this research and distributed over two parties, owner and contractor. • The questionnaire consists of three sections, each section aims to gather different information.

  11. Questionnaire • Pilot test It is a preliminary study conducted in order to evaluate questionnaire template to get a final, error-free, and clear template. • Ways to send questionnaires • E-mail. • Transmission by hand.

  12. Contractors’ sample Data was analyzed from each party’s point of view From this figure, it is shown that only 58% of respondent have responded.

  13. Work experience Because of high level of experience it is expected that the data will be more accurate and reliable.

  14. Classification of contractor company Most of contractors companies in Nablus are classified from first to third degree

  15. Average number of issuing

  16. Impact of issuing claims on the project Increase in the cost of the project to the owner has the greatest impact, and the second impact is delay in completion the project.

  17. common way to solve claims Negotiation method is considered as a cheap and saves time.

  18. Identifying the responsible for each cause • Data was analyzed and each cause was allocated for the party who is responsible for it. • In this part of questionnaire, the weighted stake (measured by no. of ticks) of each cause was calculated and allocation made to the party with the highest weight that is 33% or more.

  19. Causes of claims and the degree of occurrence

  20. Causes of claims and the degree of occurrence cont.

  21. Causes of claims and the degree of occurrence cont

  22. Conclusion • In conclusion, there is a significant difference perspectives between both owner and contractor. • This is because an owner expects that the project will be completed within its established schedule and within its cost.

  23. Conclusion • However, a contractor try to complete the project though there is always a probability of obstacles facing any project naturally.

  24. Recommendation The designer should prepare

  25. Recommendation • Employ qualified engineers • Give authority to approve the drawings and samples. • Make sure that the fund is available

  26. Tender is ready

  27. Recommendation • Check all site conditions, especially the soil reports. • Make sure that the specification of materials that needed are clear • Clear bill of quantities and specification.

  28. Hope you enjoy our presentation, and if you have any questions, please don't hesitate

More Related