1 / 8

Pavement Condition Assessments Mobile Data Collection Unit

Pavement Condition Assessments Mobile Data Collection Unit. Flooding & Drainage Committee March 30, 2010. Pavement Condition Assessments. Historically, Visual Inspection and Ratings Different eyes, different ratings Database of Values & Information Currently, Data Mobile Collection Unit

enrico
Télécharger la présentation

Pavement Condition Assessments Mobile Data Collection Unit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pavement Condition Assessments Mobile Data Collection Unit Flooding & Drainage Committee March 30, 2010

  2. Pavement Condition Assessments • Historically, Visual Inspection and Ratings • Different eyes, different ratings • Database of Values & Information • Currently, Data Mobile Collection Unit • Based on field measurements • Objective evaluation and assessment • Calculated Conditions for Database Use

  3. Condition Assessment Hardware CrackScope Crackscope: Takes continuous images of pavement and determines extent and severity of cracking. Road Profiler: Uses lasers and accelerometers to measure rutting and roughness Road Profiler

  4. Location and Distance Measurement Hardware Distance Measuring Instrument GPS Device

  5. 360º Video Camera 11 cameras at 30 frames per second to capture 360º view of right-of-way

  6. Data Visualization

  7. Progress as of March 2010 Initial Effort/Testing Period Focus: District I (proximate location to base) Secondary Effort Engineering & Construction requested update of Major Thoroughfare Conditions Citywide for CIP Planning

  8. Tentative Completion Schedule

More Related