1 / 2

1 ST BRIG

4 TH BRIG. 5TH BRIG. 2 ND BRIG. = COMPANY STREET DIRECTION. = HQS. 1 ST BRIG. ART ANNEX. 3 RD BRIG. 1 ST BRIG. CAV. 243 FEET. 15. 150 FEET. 63 FEET. 30 FEET. 15 A-FRAMES. 30 FEET front. 15 A-FRAMES.

eryk
Télécharger la présentation

1 ST BRIG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4TH BRIG 5TH BRIG 2ND BRIG = COMPANY STREET DIRECTION = HQS 1ST BRIG ART ANNEX 3RD BRIG 1ST BRIG CAV

  2. 243 FEET 15 150 FEET 63 FEET 30 FEET 15 A-FRAMES 30 FEET front 15 A-FRAMES • Space calculated by taking number of registrants and dividing by 33 to yield number • Of company streets 30 foot frontage x 243 depth needed. Each street had 15 A-frame • Tents per side with 10 foot street, 2 cooking area, space for 2 company commander • Wall tents and 1 regimental/battalion level wall tent. • Frontage calculation based on 30 feet x number of calculated company streets • Depth calculated using standard 243 feet.

More Related