1 / 9

ILWG FY2011- Cadet Powered Orientation Flight Program Goals

ILWG FY2011- Cadet Powered Orientation Flight Program Goals. Maj Eric Templeton ILWG/DO etempleton@ilwg.cap.gov 1Lt Cher Gupta-Fletcher ILWG/OO coo@ilwg.cap.gov 9 Jan 2011. Purpose of Discussion. Educate ILWG of FY2011 Cadet Powered Orientation Flight Program Goals FAQs. Page 1.

eugene
Télécharger la présentation

ILWG FY2011- Cadet Powered Orientation Flight Program Goals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILWG FY2011- Cadet Powered Orientation Flight Program Goals Maj Eric Templeton ILWG/DO etempleton@ilwg.cap.gov 1Lt Cher Gupta-Fletcher ILWG/OO coo@ilwg.cap.gov 9 Jan 2011

  2. Purpose of Discussion • Educate ILWG of FY2011 Cadet Powered Orientation Flight Program Goals • FAQs Page 1

  3. ILWG FY2011 Goals: Adopted by All Group Commanders 9 Jan 2011 • Goal = 285 rides = an increase to 125% FY2010 (excl Encampment) • Every Group has an Orientation Flight Coordinator • these names are published on the ILWG Air Ops webpage • Every squadron flies at least once per year • Group Commanders assign sqns that need to be flown to experienced sqns with active pilot communities • Establish Group Coordinator and Pilot awards • Group Coordinator which arranges the most events • Pilot who flies the most powered orides • Pilot who flies the most (unique) squadrons Assumption: The ILWG will receive sufficient funding to support our goals. Page 3

  4. ILWG O-Ride FAQs – very important! Maximum ferry time of 25% per o-ride event is no longer a limit which will be imposed lower than the Wing level Anticipated ferry time must be included in funding request ILWG Form 610 has been rescinded and will not be replaced – this is no longer required for o-rides As we consume our USAF O-Ride Funding, ILWG Operations will request additional funding from the GLR The following will be published on the ILWG website: Instructions for requesting ILWG funding of o-rides Available funding for o-rides ILWG & Group o-ride agreed goals and associated metrics Group Orientation Flight Coordinator names Page 4

  5. ILWG O-Ride FAQs - continued A/C maintenance moves can and sometimes do interrupt o-rides. The impact of maintenance moves may be mitigated in the following ways: The Unit or Group officer coordinating o-rides should inform the A/C POC of the date of the o-ride event. This is easily done by cc them on the request for o-ride funding. Ask the POC to keep this date in mind and try to preserve it for o-rides by seeking to work around maintenance scheduling issues if possible. Communication is the key here. The A/C POC is your resource. Page 5

  6. ILWG O-Ride FAQs - continued A/C maintenance moves can and sometimes do interrupt o-rides. The impact of maintenance moves may be mitigated in the following ways: Mid cycle oil changes should not disrupt planned o-rides now that these oil changes may be done between 40-60 tach hours If the plane you scheduled is about due for a mid-cycle oil change talk to the A/C POC ahead of time to learn of plans for the oil change informing the POC of the scheduled o-ride date. Request that the o-ride date be accommodated. Contact the ILWG Orientation Flight Officer or the Operations Officer if needed. Page 5

  7. ILWG O-Ride FAQs - continued A/C maintenance moves can and sometimes do interrupt orides. The impact of maintenance moves may be mitigated in the following way: Should an A/C be removed from its home base for a period of time, please remember that the 25% A/C ferry time limit no longer applies on a Unit level.  (It applies on the Wing level.) If you need a different plane: present your request to use an alternate plane with the anticipated ferry time to the ILWG Orientation Flight Officer asking for approval. Idea: ask a pilot who lives near the alternate airplane to fly the plane to you. In other words: use all of your resources. Reasonable ferry time requests given the number of cadets signed up for the o-ride event will be approved. Page 6

  8. Group Orientation Flight Coordinators Group 1: Captain Kent Raney Group 2: Captain Gary Sprigg Group 3: Lt. Col. Jerry Lowry Group 9: TBD Group 14: TBD Group 22: Capt. Monica (Tommy) Whang Page 7

  9. ILWG FY2011 Operations Staff – Most were Recently Appointed Lt. Cher Gupta-Fletcher - Operations Officer Deputy Officer is not named yet Lt. Dan Johnson - Orientation Flight Officer Major Steve Snyder - Glider Program Officer Captain Bruce Brunkow - Chief FRO Officer Michelle Clark - DOFM Page 24

More Related