1 / 16

Introduction to the IQ Conference Room

Introduction to the IQ Conference Room. Team 2 Christine Wessels | Desiree Hodge | Holly Maso. Background. CDH Tech has 8 newly renovated IQ Rooms nationwide Each facility is staffed with an event support team Client satisfaction index has significantly decreased since the renovation.

evan
Télécharger la présentation

Introduction to the IQ Conference Room

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction to the IQ Conference Room Team 2 Christine Wessels | Desiree Hodge | Holly Maso

  2. Background • CDH Tech has 8 newly renovated IQ Rooms nationwide • Each facility is staffed with an event support team • Client satisfaction index has significantly decreased since the renovation EDIT 705 | Team 2 | 12.08.2008

  3. Client Requirements • Training solution to address gaps in staff performance • Training must occur on site • Each site’s staff must be divided into 2 sessions • Training materials must be editable and compatible with MS Office Suite EDIT 705 | Team 2 | 12.08.2008

  4. Training Goals & Objectives Events and IT support staff will be able to: • Pre-configure the IQ room’s audio/video equipment and lighting systems • Troubleshoot technical issues to ensure that the room is fully functional prior to events • Post-event surveys will reflect at least 90% client satisfaction EDIT 705 | Team 2 | 12.08.2008

  5. Summary of Course Design Approach • Defined the problem • Analyzed learners • Current knowledge • Learning preferences • Group characteristics • Outlined general task requirements • Identified performance gap EDIT 705 | Team 2 | 12.08.2008

  6. Summary of Course Design Approach Task requirements • Connect a laptop to wireless internet • Configure lights (on, off, dim, etc.) • Conduct single- and multi-point audio and video teleconferences • Project slides to the LCD screens and remote video participants EDIT 705 | Team 2 | 12.08.2008

  7. Summary of Course Design Approach • Summarized two main goals: • Configure equipment • Troubleshoot issues • Created the course outline • Planned the course “Walk-thru” EDIT 705 | Team 2 | 12.08.2008

  8. Course Content Description Content Overview: • Module 1 – Course Overview • Module 2 – Operating the Lighting System • Module 3 – Pushing a PowerPoint slide show from a laptop to the LCD screens • Module 4 – Conducting a Video Tele-Conference (VTC) • Module 5 – Conducting an Audio Conference • Module 6 – Configuration Exercise • Module 7 – Wrap-Up EDIT 705 | Team 2 | 12.08.2008

  9. Course Content Description • Instructional Strategies (Modules 1-5) Design Approach: • Presentation • Demonstration • Application • Integration EDIT 705 | Team 2 | 12.08.2008

  10. Course Content Description Prototype Materials • Instructor’s Guide • Learner’s Guide • Student Troubleshooting Checklists (developed by students throughout course) • Handouts: • 6.1: Large Group Discussion • 6.2: Group Exercise • 6.4: Final Exercise EDIT 705 | Team 2 | 12.08.2008

  11. Project Development & Implementation Plan • Deliverables • Timelines • Requirements • Next Steps EDIT 705 | Team 2 | 12.08.2008

  12. Project Development & Implementation Plan Deliverables • Instructional Design Document • Instructional Materials: • Instructor guide • Student guide • Instructional materials • Pilot • Implementation • Participant Feedback EDIT 705 | Team 2 | 12.08.2008

  13. Project Development & Implementation Plan Timelines* * Dates may vary and are based on date of design document acceptance and client availability. EDIT 705 | Team 2 | 12.08.2008

  14. Project Development & Implementation Plan Requirements • Review of documentation • Contact with SMEs (as needed) EDIT 705 | Team 2 | 12.08.2008

  15. Project Development & Implementation Plan Next Steps • Management review of design document • Modifications / final approval EDIT 705 | Team 2 | 12.08.2008

  16. Questions?

More Related