1 / 9

Current Status of Implementation of MTN at RTH Beijing

Current Status of Implementation of MTN at RTH Beijing. Li Xiang National Meteorological Information Center, CMA. GTS links. New Upgrade. Beijing-Ulan Bator Upgraded from 75Baud ASYNC circuit to 14.4kbps IP link in February 2005. Beijing-Moscow

evelyns
Télécharger la présentation

Current Status of Implementation of MTN at RTH Beijing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA

  2. GTS links ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

  3. New Upgrade • Beijing-Ulan Bator • Upgraded from 75Baud ASYNC circuit to 14.4kbps IP link in February 2005. • Beijing-Moscow • Upgraded from X.25 to IP over FR in April, 2005. • Beijing-New Delhi • Upgraded from X.25 to IP over FR in December, 2005. • Beijing-Tokyo • Beijing’s incoming PVC being upgraded from 48kbps to 96kbps for receiving satellite data from Tokyo ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

  4. Upgrade plan • Beijing-Pyongyang • Upgrade to 64kbps dedicated line in 2006. • Beijing-Bangkok • tentative plan: move from X.25 to IP in 2006. • Beijing-Hanoi • Upgrade issue being discussed. ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

  5. Internet connections • Beijing-Kazakhstan • established in December 2004 • E-mail • Beijing-Melbourne • established in February 2006 • WMO FTP ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

  6. GTS system (1) DMZ Internet Internet Server Cisco PIX Firewall Offenbach Tokyo Moscow New Delhi RMDCN Routers Cisco 2620 (HSRP) IP over FR • Back End • IBM P650 • Duplicated system • UNIX based Cisco PIX Firewall GTS Router Cisco 3640 IP Seoul Ulan Bator • Front End • AlphaServer ES40 • Duplicated system • UNIX X.25 circuits Bangkok Router Asynchronous circuits Hanoi Pyongyang MSS ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

  7. GTS system (2) • Protocols • FTP • TCP sockets • X.25 • ASYNC • SMTP • Maximum length of bulletins • Currently, • 15Kbytes for message exchange • 500Kbytes for file transfer • January, 2007 • 500Kbytes (both for message exchange and file transfer) ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

  8. GTS system (3) • Binary messages • Received messages (T1= H, I, P) • BUFR data: AMDAR, SYNOP, TEMP, Satellite data, …… • GRIB products: AMMC, ECMWF, EDZW, EGRR,KWBC,RJTD • FAX charts: EGRR, RJTD, RUMS • Received from Offenbach, Tokyo, Moscow, Melbourne, Seoul • Relayed to Offenbach, Tokyo, Moscow, Seoul, Ulan Bator • Local data and products (T1= H, I) • NWP products in GRIB codes • Segmented for the transmission via TCP sockets • Not segmented for file transfer • Satellite data in BUFR codes • Segmented for the transmission via TCP sockets and via FTP • Not segmented for file transfer • Distributed toOffenbach, Tokyo, Moscow, Melbourne, Seoul, Ulan Bator ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

  9. Satellite-based services • CMA’s PCVSAT broadcasting system • Pyongyang, Ulan Bator, Hanoi, Yangon • Available data for the neighboring centers • GTS data (A/N bulletins, binary messages, fax charts) • CMA’s NWP products (in GRIB codes) • CMA’s FY satellite data (BUFR products, images) ISS/ICM-MTN & ET-OI , Geneva, 16-19May 2006

More Related