1 / 13

INSPEÇÕES EM FUNDAÇÃO DE CONCRETO

1ª Empresa de transferência de tecnologia entre Brasil e Rússia neste segmento. INSPEÇÕES EM FUNDAÇÃO DE CONCRETO. 4 º ANO. Certificada ISO 9001:2008. O SISTEMA. Equipamento de inspeção em fundações de concreto. Pile Testing System. A APLICAÇÃO. Sistema de avaliação rápida e simples.

eydie
Télécharger la présentation

INSPEÇÕES EM FUNDAÇÃO DE CONCRETO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1ª Empresa de transferência de tecnologia entre Brasil e Rússia neste segmento INSPEÇÕES EM FUNDAÇÃO DE CONCRETO 4º ANO Certificada ISO 9001:2008

  2. O SISTEMA Equipamento de inspeção em fundações de concreto. Pile Testing System

  3. A APLICAÇÃO Sistema de avaliação rápida e simples.

  4. Pile Testing System Low Strain Test Method • Based on measuring bar wave response to small hammer impact • Measures in both time domain and frequency domain • Can measure dynamic stiffness, length and mobility

  5. Pile Testing System Frequency Domain XFer FFT Mobility Force/Frequency Force/Time FFT XFer Velocity/Frequency Velocity/Time

  6. t Frequency domain ½∆F ∆F Frequency Length = velocity / 2 ∆F Fixed End Condition - Undamped Time domain Time Length = velocity x time / 2 Fixed End

  7. Fixed End Condition - Damped Head Response – time domain Effectively an increase in pile impedance Increase in sectionStiff Soil InterfacesRock Socket Time Head Response – frequency domain Frequency

  8. ∆F ∆F Un-damped Free End Condition Time domain Length = velocity x time / 2 Frequency domain Free End Length = velocity / 2 ∆F

  9. Free End Condition - Damped Head Response – time domain Effectively a decrease in pile impedance: Pile Toe/CrackDecrease in QualitySoft Pile Toe Time Head Response – frequency domain Frequency

  10. Length = c/2∆f Mobility = 1/ρcA Stiffness = 2π f(m) V/F(m) Impulse Response (Mobility) Curve VF V/F Frequency

  11. Contatos: Serra-ES Tel: +55 27 3064-0912 +55 27 3064-0832 Fabio Cerqueira Cel.: 27 81820950 fabio@ibndt.com Igor Kozyrev Cel.: 27 81827255 igor@ibndt.com SERVIÇO DE INSPEÇÃO EM FUNDAÇÃO DE CONCRETO www.ibndt.com

  12. FIM Obrigado !

More Related