Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997

Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997. Located west of Highway 101 Access to Gaviota Beach and Hollister Ranch. Gaviota Beach Road Bridge No. 51C-324. 80 foot long railcar bridge at existing roadway grade

fadhila
Télécharger la présentation

Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gaviota Beach Road – Transportation Division County ProjectSummer Crossing – Pre 1997 • Located west of Highway 101 • Access to Gaviota Beach and Hollister Ranch

  2. Gaviota Beach RoadBridge No. 51C-324 • 80 foot long railcar bridge at existing roadway grade • Bridge construction completed – 1997 looking upstream

  3. Gaviota Beach Road Bridge No. 51C-324 • Situation on February 2, 1998 • Debris blocked flow under bridge and washed out the north approach roadway

  4. Gaviota Beach Road Bridge No. 51C-324 • Immediately following the 1998 storm, a concrete road approach was constructed • Repaired north approach road.

  5. Gaviota Beach Road Bridge No. 51C-324 • FEMA –H.M.P. 406 100% approved funding for bridge replacement with all-weather crossing @ $3.8 Million Dollars • FEMA = 75% OES = 25% • Request for Proposals for design services – May 2002 • Contract Awarded to Quincy Engineering-June 2002 • URS Corp preparing EIR/EA

  6. Gaviota Beach Road Bridge No. 51C-324 Preferred Project Selection Project Development Team • Determined criteria for design • Gathered input from Hollister Ranch and State Parks • Developed alternatives providing the greatest service with the least disruption

  7. Gaviota Beach Road Bridge No. 51C-324 Stakeholders Meeting held -December 2002 • Resource Agencies and affected parties in attendance • Permitting Agencies in support of proposed project • Project viewed as environmental benefit and safety improvement

  8. Gaviota Beach Road Bridge No. 51C-324 Project Issues Approach Roadway • Elevation increase of 12 feet • 600 feet to the north, 200 feet to the south • New bridge 250 feet in length • New roadway and bridge built to current standards • Access road to Gaviota State Park • Temporary access road during construction

  9. Gaviota Beach Road Bridge No. 51C-324 Project Status • Project Report complete-Jan 2003 • Notice of Preparation complete-March 2003 • Funding Complete – December 2003 • Preliminary Engineering design to URS for use in EIR – March 2004 • Environmental Review Complete – December – 2004 • FEMA Section 7 Consultation – August – 2004 • Permits – January – 2005 • Final Design and Bidding Process – February 2004 (65% design) May-2005 to Proceed • Begin Construction Detour –August 2005 • Complete Construction – August 2006