Test Program. Test Program: Accomplishments. Completion of Systems document Hardware: Purchase requests submitted Hardware installation completed for new racks and networking equipment NEIS Beta release: April 2014 Website and CoG projects created. Test Program: In Progress.

faraji
Télécharger la présentation

Test Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test Program

  2. Test Program: Accomplishments • Completion of Systems document • Hardware: • Purchase requests submitted • Hardware installation completed for new racks and networking equipment • NEIS Beta release: April 2014 • Website and CoG projects created

  3. Test Program: In Progress • Verification: • Preparation of EMC-like system for HIWPP • Development of new MySQL database • Coordination with NCEP on verification requirements • Testing of new gateway for transfers between zeus and GSD • Development of new ensemble post-processing techniques using sample data collected

  4. Test Program: Next Steps • Installation of new storage and compute hardware • Making NEIS available to Beta testers and gather feedback • Building components for data distribution • Testing infrastructure and data flow • Set up real-time monitoring and support

  5. Issues • Have lost key personnel in Verification, NEIS, and IT • Hiring in progress

  6. System Document 4. System Design Description • Components and Interface • System Architecture - Hardware and Networking • NEIS Design • Real-time Distribution Design • Verification Design • Ensemble Post-Processing Design 5. Data • Data Sets • Data Formats and Configurations • Data Flow • Data Lifecycle 6. Support and Maintenance • Real-time Support • Documentation • Software Defect Handling • Lifecycle Maintenance 1. Overview • System Description • Other relevant documents • HIWPP Project Plan 2. Planning and Management • Schedule • Resources • Configuration Management • Software Development Process • Change Control 3. System Requirements • NEIS • Functional requirements • Performance requirements • User interface requirements • Real-time Data Distribution • Functional requirements • Availability requirements • Verification requirements • Ensemble Post-Processing requirements

  7. Data Sets – Real-time Model Data • HIWPP Hydrostatic models • FIM-1 (on jet) • FIM-2 (on zeus), alternate? (Alternative DA, physics, or other) • GFS research version for HIWPP • GFS alternate? • NAVGEM • NAVGEM alternate? • HIWPP Non-hydrostatic models • NIM • NMMB • NEPTUNE • HIRAM • MPAS • Ensemble Data • FIM Ensemble • Experimental Ensemble Product • GFS Operational Data • GEFS Operational Data • Initial conditions (from GFS Operational)

  8. Data Specifications - review Format: GRIB2 Frequency • Hourly for days 1-7 • 6-hourly for days 1-14 Resolution FIM: 1/8 degree lat/lon GFS, NAVGEM: 1/4 degree lat/lon Vertical levels • Isobaric levels • Increments of 25 hPa from 1000 hPa to 100 hPa, then 70/30/20/10/5/1 hPa Variables – 3D H RH T Condensate U Vertical velocity V Additional 2D variables 2m temp 10m wind precip-total precip-convective snow water equivalent MSLP surface pressure surface elevation 80m u/v precipitable water RH w.r.t PW OLR dynamic tropopause: potential temperature u/v pressure sensible heat flux latent heat flux downward shortwave radiation downward longwave radiation cloud-top height