Metro Vancouver’s Seymour Capilano Filtration Project

Metro Vancouver’s Seymour Capilano Filtration Project. Howard Dallimore Senior Project Engineer Metro Vancouver. The largest filtration plant in Canada and one of the biggest of its kind in North America.

feng
Télécharger la présentation

Metro Vancouver’s Seymour Capilano Filtration Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

  2. The largest filtration plant in Canada and one of the biggest of its kind in North America. • Treats water from two watersheds and includes a 16,000 HP pumping station, twin tunnels each 7.1 km long and a 2 MW energy recovery facility. • Spent filter backwash water is treated and over 98% is recycled to the head of the plant. • The world’s largest ultraviolet disinfection system.

  3. Includes a series of features to maximize energy efficiency. • Extensive use of sustainable and environmental technologies used in its design and construction. • The plant is fully automated and integrated with Metro Vancouver’s SCADA system.

  4. Water Sources • Wholesaler to over 2 million people • 3 protected lake supplies: • Capilano • Seymour • Coquitlam

  5. Water Quality Concerns Corrosion Waterborne Disease Turbidity Re-growth

  6. Turbidity Events

  7. Seymour-Capilano Filtration Project

  8. Elements of the Seymour-Capilano Filtration Project (SCFP) • Capilano Pumping Station • Capilano Energy Recovery & Break Head Tank • Twin Tunnels linking Seymour and Capilano sites • Seymour-Capilano Water Filtration Plant

  9. Filtration Project Rendering

  10. Artist’s Rendering of Seymour-Capilano Filtration Plant

  11. Seymour- Capilano Filtration Plant

  12. Seymour- Capilano Filtration Plant

  13. Filtration Plant

  14. Guard House

  15. Pre-Treatment Building

  16. Pre-Treatment

  17. Flocculators and Filters

  18. UV Units - Filter Gallery

  19. UV Disinfection Unit

  20. OMC Building

  21. OMC Lab

  22. OMC Control Room

  23. Filtration Plant Post Treatment

  24. Geothermal System

  25. Inside Clearwells

  26. Back Wash Water Treatment Tanks

  27. Residuals (Sludge) Collector

  28. Residuals Building

  29. Residuals

  30. Residuals

  31. Sustainable Technologies Economic Prosperity • Community Input • Aggregate mined from Lower Seymour Conservation Reserve • Concrete batch plant located north of plant • Eco Smart concrete • Stormwater management • Protected stand of mature trees • Amphibian pond conservation • Green Building Design – LEED • Geothermal Heating and Cooling • Energy and water conservation strategy • Green roof technologies Environmental Integrity Social Well - Being

  32. Siting, Development and Protection Protected Tree Stands Frog Pond LSCR Parking Lot

  33. Plant Salvage 2003 • Municipal Salvage • Non-profit Organizations • Evergreen School Salvage Event • Public Salvage Day

  34. Landscaping and Habitat Creation

  35. Site Restoration

  36. Landscaping on Clearwell Sept. 29, 2009