An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL CSC - ESSC Jan'09

  2. CSC Electronics Status • Conducted a Work Shop at Rice U in Houston • January 8th through 11th • Description: • What problems were encountered during running? • Of those, what have been fixed • What the plans to fix the remaining problems • What resources, (people, material, time) are needed to resolve the problems • What improvements should we make (as distinct from fixing problems) • What are the plans? • What resources are needed to make the improvement? • Maintenance Estimate • For each module, how many do we have? • How many spares do we have? • Where are the spares? • What level of engineering effort is needed to maintain the element? • Indico Link > • http://indico.cern.ch/conferenceDisplay.py?confId=48204 CSC - ESSC Jan'09

  3. From CSC Q4’08 Report • Short Term detailed Milestones and deliverables. • Resolve issues with the operation and control of the Maraton power supplies • Identify and fix outstanding Canbus issues • Finalize optimal power-on and power-off sequences. • Replace faulty resistors in HV system • Investigate losses of communication between HV system and PVSS • Reduce rate of CRC errors in DAQ system • Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. • Further analyze the loss of programming of EPROMs • Identify and correct problems with alignment system picomotor control CSC - ESSC Jan'09

  4. LV • Resolve issues with the operation and control of the Maraton power supplies • OPFC • Failure of ON/OFF switch • Quick disconnect in input power circuit fails • With CMS working with Wiener on a fix • Failure upon power on – Soft Start Issues • Turning on too soon after power off greatly increases possibility of failure • Administrative controls have been put into place • Hardware change begun • Lack of remote monitoring and control • With CMS working on modification to add remote • Identify and fix outstanding CANBus issues • CANBus for Maraton system • Expect new server from Wiener • Work to analyze CANBus lines to find and fix any deficiencies • Start now, intensify when LV back on, work until resolved • CANBus for PCMB system > remote ON/OFF at pcrates > uses ELMB’s • Work to analyze CANBus lines to find and fix any deficiencies • Work with ELMB experts to resolve further issues • Start now and work until resolved CSC - ESSC Jan'09

  5. LV cont. • Finalize optimal power-on and power-off sequences. • Observe several issues that have been reduced by a more complex power-on sequence • To proceed further we need to combine slow control of CANBus devices and VME devices • Work will start with availability of cooling and CMS LV in cavern • Work will take about 1 month • Can operate with present power-on procedure while working on enhancements CSC - ESSC Jan'09

  6. HV • Replace faulty resistors in HV system • Work started at ISR • Work will take ~2 technicians ~2 months • Working serially > most of CSC can have HV ON during work • Investigate losses of communication between HV system and PVSS • HV computers located in S1A10 … CSC - ESSC Jan'09

  7. FE • Reduce rate of CRC errors in DAQ system • Rare but disruptive of Global DAQ • Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. • Present methods are not effective in timing in a small percentage of chamber electronics • Developing a more rigorous testing procedure to bring the lost communication rate down • Further analyze the loss of programming of EPROMs in on-chamber electronics boards • Believed to be partially caused by power-on sequence > see previous slide • Have isolated problem boards for investigation on the bench • Have instituted work around to automatically identify problem situations and rapidly respond with operator intervention CSC - ESSC Jan'09

  8. CSC Electronics Inventory • Following slides list status of electronics inventory for the CSC • For the record … CSC - ESSC Jan'09

  9. On-Chamber Boards • CSC On-chamber Electronics Boards installed /total /spares • CFE 30520306050001xxxxx CFEB one type, 5(4) per chamber 2268 /2532 /137 • ALC 30520112030288xxxxx ALCT288 ME1_1,ME1_3 144 /?? /~10 • ALC 30520112030384xxxxx ALCT384 ME1_2, ME234_2 216/?? /11 • ALC 30520112030672xxxxx ALCT672 ME2_1, ME3_1, ME4_1 108 /130 /9 • ALM 30520112130001xxxxx ALCT_MEZ one type, 1 per chamber 468 / /20 • LVD 30521222040001xxxxx LVDB one type, 1 per chamber 468 /?? /?? • LVM 30521222130001xxxxx LVMB one type, 1 per chamber 468 /?? /?? • AFE 30520106050001xxxxx AFEB one type, many per chamber 10,152 /11,616 /1054 • NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards CSC - ESSC Jan'09

  10. LV & PCRATE • CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares • PFCB LVPS 72500xxxx OPFC Bin (Crate) 6 /8 /2 • PFCM LVPS 71960xxxx OPFC Module 36 /40 /4 • MARS LVPS 72920xxxx Maraton Supply 36 /40 /4 • MARC LVPS 72960xxxx Maraton Crate 36 /38 /2 • Peripheral Crate, pcrate, Components installed /total /spares • EMUPC PC 305216030320050xxxx pcrate crate 75 /60 /15 • CBP PC 305203021620050xxxx pcrate back plane 70 /60 /10 • CRB PC 305203180220050xxxx pcrate regulator brd 88 /60 /28 • PCM PC 305216031320060xxxx PCMB 79 /60 /19 • ELM PC 305205121320050xxxx ELMB on PCMB 79 /60 /19 • Pcrate boards installed /total /spares • VCC PC 305222030320050xxxx Crate Controller 73 /60 /15 • CCB PC 305203030220050xxxx Clock and Control 84 /60 /24 • DMB PC 305204130220040xxxx DAQ Mother Brd. 550 /468 /82 • MPC Trigger PC 305213160320050xxxx Muon Port Card 70 /60 /10 • TMB Trigger PC 305220130220050xxxx Trig Mother Brd. 570 /468 /102 • RAT Trigger PC 305218012020050xxxx RPC ALCT Trns. 690 /468 /222 CSC - ESSC Jan'09

  11. CSC HV • HV ME1/1 > CAEN System installed /total /spares • Cc HV1 3052## Crate 2 /2 /0 • Cc HV1 3052## Board 16 /18 /2 • HV > UF Custom System installed /total /spares • HV UF Custom System installed /total /spares • HDS 30520804192005xxxxx Distribution-36 126 /157 /31 • HDL 30520804122005xxxxx Distribution-30 144 /179 /36 • HDC 30520804032005xxxxx Distrib Crate 30 /34 /4 • HDP 30520804162005xxxxx Distrib Patch 8 /9 /1 • HMB 30520813022005xxxxx Master board 40 /50 /10 • HMC 30520813032005xxxxx Master Crate 8 /10 /2 • HPS 30520816192005xxxxx Primary HV src 8 /10 /2 • HCC 30520803032005xxxxx Control comp 2 /3 /1 • HLV 30520812222005xxxxx LV power supply 2 /3 /1 • HMP 30520813162005xxxxx Master Patch 2 /5 /3 • HLP 30520812162005xxxxx LV patch panel 2 /4 /2 • HCP 30520803162005xxxxx Control patch 2 /4 /2 • HPC 30520816032005xxxxx Primary HVPS ctr 8 /8 /2 (spare parts) CSC - ESSC Jan'09

  12. CSC Track Finder • CSC TF installed /total /spares • CCC Trigger TF 3052000000200500000 9U CAEN VME 1 /3 /1 • 0 Trigger TF 3052200603200500000 wiener crate ( trigger) 1 /2 /1 • 0 Trigger TF 3052200602200500000 TF backplane 1 /3 /2 • DDU Trigger TF 3052 200500000 DDU 1 /2 /1 • DDE Trigger TF 3052040405200500000 DDU extender 1 /3 /1 • TSP Trigger TF 3052201916200500016 SP 12/17 /2 • CCB Trigger TF 3052030302200500025 CCB 1 /3 /1 • 0 Trigger TF 3052000000200500005 muon sorter 1 /5 /3 • 0 Trigger TF 3052202002200500006 CSC-DT transition board 12/ 18/ 5 NOTE: Covered under Trigger as well CSC - ESSC Jan'09

  13. CSC FED • FED Crates > Wiener 9U VME installed /total /spares • FED FED 3052060504200510000 FED Crate 4 /4 /0 (1 sp PS) • FED Boards > OSU Custom Brds installed /total /spares • CVC FED 3052032203200510000 CAEN 6U CC 4 /5 /1 • One sent to CAEN for repair, good spare is loan from pool • DCC FED 3052040303200510006 Clock and Control 4 /6 /2 • 2 more to be shipped to CERN • DDU FED 3052040421200510032 Data Board 36 /?? /?? • Pcrate Network > GBit installed /total /spares • GNS GIG 3052071419200510001 GBit Ethernet switch 8 /10 /2 (1 sp installed) CSC - ESSC Jan'09