The Company:. More than 12 years of experience in designing, planning and construction of biogas power plants. Input of the first plants: organic waste (fats and flotates ); Weser-Ems region: intensive livestock farming Biogas-boom since amendment of

galia
Télécharger la présentation

The Company:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Company: • More than 12 years of experience in designing, planning and construction of biogas power plants. • Input of the first plants: organic waste (fats and flotates); • Weser-Ems region: intensive livestock farming • Biogas-boom since amendment of • the EEG (law on renewable energy) • in 2004 • More than 250 biogas plants built • Installed capacity over 140 MWel

  2. The Company: Headquarters : biogas weser-ems GmbH & Co. KGZeppelinring 12-16D-26169 Friesoythe Branch office Großenhain Carl-maria-von Weber-Allee 51 01558 Großenhain Affiliates: Biogaz-tech Spółka zo.o.ul. Długa 4463-200 Jarocin Ies biogas SrlVia T. Donadon, 4I-33170 Pordenone - ITALY bentec bioenergies SLCalle Sant Josep, 1417176 Sant Esteve d´en Bas (Girona) Spain

  3. Energy For The Future • Biogas • versatile source of renewable energy: providing electricity and heat • reduction of harmful methane emissions • CO2neutrality • environmentally friendly way of preserving resources

  4. Biogas Flow Diagram

  5. Planning and Project Development • Project • Conception • Quotation • Financing Assistance • Approval planning

  6. Plant Construction • Building phase • bwe installation teams set up the agitators, gas storage roofs and pipelines • Use of low maintenance and energy-efficient agitators • Connection of the high performance CHP units with engines upward of 190 kW

  7. Technology • Biogas plant • User friendly process control systems • Control of individual plant components and documentation of the control • parameters • Remote access to the control system

  8. Natural Gas From Biogas • Biogas Preparation • Often there are no possibilities to use the heat economically • Upgrading of biogas to natural gas quality • Transportation through the existing natural gas network • Alternative use as fuel for vehicles

  9. Heat use • Transportation of heat • Increasing efficiency by utilizing surplus heat • Use of district heating for nearby houses and stables • Wide variety of possible consumers, • e.g. heat for drying plants (cereals or digestate) • Arbitrary choice of temperature level (default at 85 °C)

  10. Micro-Gas Distribution System • Transportation of biogas • the CHP is placed next to the heat consumer • transport of biogas to the CHP unit through a gas pipeline • lower investment required compared to district heating • moreefficient use of thermal energy, no losses during transportation

  11. Reference Plants Naturgas Ardorf • Technical Parameters: • Year of construction: • Power kWel: • Substrates: • Digester: • Post-digester: • Storage: • 7 • L • 2007 • 1131 kW + 190 kW • Energy crops • 1 x Ø 23 m • 1 x Ø 23 m • 1 x Ø 28 m

  12. Biogasanlagen Heinfelde (NawaRo) • Technical Parameters: • Year of construction: • Power kWel: • Substrates: • Digester: • Post-digester: • Storage: • 7 • L • 2006 • 835 kW • NawaRo • 2 x Ø 25 m • 1 x Ø 25 m • 1 x Ø 25 m

  13. Biogasanlagen Heinfelde (Kofermente) • Technical Parameters: • Year of construction: • Power kWel: • Substrates: • Digester: • Post-digester: • Storage: • 7 • L • 2006 • 1064 kW + 500 kW • Organic Waste • 2 x Ø 25 m • 1 x Ø 25 m • 1 x Ø 30 m

  14. Biogaspark Felgentreu • Technical Parameters: • Year of construction: • Power kWel: • Substrates: • Digester: • Post-digester: • Storage: • 7 • L • 2007/08 • 10 x 844 kW • NawaRo • 10 x Ø 23 m • 10 x Ø 23 m • 10 x Ø 26 m