1 / 13

PENGANTAR DINAMIKA TANAH

PENGANTAR DINAMIKA TANAH. HERWAN DERMAWAN, MT. JL. Azalea No.6 – Blok J Pondok Hijau - Bandung. Laboratorium Mekanika Tanah FPTK UPI. 0852 22 30 31 98. HERWAN DERMAWAN, MT. “You Can if You Think You Can”. TEGAS dan TEGA (Stephen G.H.). Mata Kuliah : Mekanika Tanah I dan II

Télécharger la présentation

PENGANTAR DINAMIKA TANAH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PENGANTAR DINAMIKA TANAH

  2. HERWAN DERMAWAN, MT. JL. Azalea No.6 – Blok J PondokHijau - Bandung LaboratoriumMekanika Tanah FPTK UPI 0852 22 30 31 98

  3. HERWAN DERMAWAN, MT. “You Can if You Think You Can” TEGAS dan TEGA (Stephen G.H.)

  4. Mata Kuliah : • Mekanika Tanah I dan II • Pondasi I dan II • PraktikumMekanika Tanah • MenggambarTeknik • BahasaPemograman • PondasiDinamis/Mesin • Dinamika Tanah • Perbaikan Tanah

  5. ATURAN MAIN • Niat • Penuhisemuaperaturan UPI • Kehadiran (kadangabsenpanggil) • Sikapdantingkahlaku • Tata kesopanan • dll • Kuliah • Tepatwaktu • Serius

  6. ATURAN MAIN • Tugas • Tugas besar/kecil • Lembarpembimbingan • Min 12 kali asistensi – Tercatat • Cara PelaporanTugas • Rapih, bersih • Profesional • Dijilidrapi, lembarasistensidilampirkan • Laporandikumpulkandi KM, diabsendanditandatangani

  7. ATURAN MAIN • Tidak bolehterlambat – TIDAK diterima • SEMUA ditulistangan, tidak bolehmenggunakankomputer • Lembarpembimbingan • Min 12 kali asistensi – Tercatat

  8. ATURAN MAIN • Tugasdikerjakanoleh SEMUA mahasiswa, TANPA terkecuali (Mengulang, senior, kerja di tempat lain, rumahjauh, sakit, dll) • TIDAK ADA tolerasibagi yang tidakmengerjakantugas, mencontekdanperbuatan illegal lainnya

  9. ATURAN MAIN • Tugasharusdibuatrapih, professional, diberi cover yang baik/seragamdanditandatangani

  10. ATURAN MAIN • 6. NilaiAkhir ; • Kehadiran/Asistensi (syarat min. UPI) • TugasPorsiterbesar • UTS • UAS SEMUA BERHAK DAN WAJIB DAPAT “A”

  11. DO • RajinAsistensi • Banyaknanya banyaktahu • Aktifdikelas (+)  Bertanya, Berpendapat • PelaporantiapasistensiRapih • Selaluber-referensike Text Book • Jangan “terlalupercaya” samatemanataubahkanDosen, galisendirimasalahnya • Segeramulai Proses Asistensi!!

  12. DON’T • Terlambat (kuliah, asistensi, tugas, ujian) • Mintaperlakuan “khusus” • Kegiatan lain diluarkuliah • Kerjasama (ujian, tugas) • “Minta” Nilai - NilaiadalahHakbukan “Sedekah” • Malubertanya

  13. ANDA SELALU PUNYA PILIHAN BERANI??

More Related