CERN related research program in 2006-2011 Nuclear Physics

CERN related research program in 2006-2011 Nuclear Physics. High energy nuclear physics ALICE experiment Installation and Commissioning Data taking Data analysis – offline computing Physics program HENP after 2011 Theory ISOLDE activity. ALICE at LHC. First collision: mid 2007

garron
Télécharger la présentation

CERN related research program in 2006-2011 Nuclear Physics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CERN related research program in 2006-2011Nuclear Physics • High energy nuclear physics • ALICE experiment • Installation and Commissioning • Data taking • Data analysis – offline computing • Physics program • HENP after 2011 • Theory • ISOLDE activity

  2. ALICE at LHC • First collision: mid 2007 • ALICE lifetime = 10 years

  3. ALICE - budget

  4. Installation and Commissioning – 2006 (1) • Installation of the TPC FEE • Dec. 2005 – Feb. 2006 • 3 people for 2 months 1 person-month @ CERN: ~35 kNOK

  5. Installation and Commissioning – 2006 (2) • TPC/HLT pre-commissioningwith laser beams and cosmics • Feb. 2006 – Aug. 2006 • 1-2 people for 2-3 months • Installation of the TPC RCUs • Summer 2006 • 1 person for 2 weeks

  6. Installation and Commissioning – 2006 (3) • Installation of the PHOS FEE and RCU • Spring 2006 • 2 people for 2 months • PHOS pre-commissioning and calibration • PS beam in summer 2006 for 8 weeks • 1-2 people for 2.5 months (shifts)

  7. Detector installation plan

  8. Commissioning - 2007 • Commissioning of the front-end electronics • TPC • PHOS • Installation and commissioning of the HLT • Full connectivity • 30% of computing power • First pp collisions in summer 2007 • First PbPb collision in 2008

  9. Running scenario • First pp collisions in 2007 • 1 month per year heavy ion run • 7 months per year pp • Running schedule for the first 5 years • Regular pp runs at 14 GeVreduced luminosity between 1029and 5*1030 cm-2sec-1 which will leads to event rates from 10 kHz to 200 kHz • 2-3 years PbPb collisionsluminosity of 5*1026 cm-2sec-1 which leads to an interaction rate of 4 kHz • 1-2 years ArAr • 1 year pPb like collisions

  10. Data analysis – offline computing • Scandinavian offline computing contributed through NDGF (Nordic Data Grid Facility) • Agreed sharing ATLAS/ALICE 50%/50% • ALICE computing needs approx. half of ATLAS but half the number of collaborators • LCG resource status: 50% shortfall for ALICE

  11. ALICE ATLAS CMS HR 2001 LHCC 2004 HR 2001 LHCC 2004 HR 2001 LHCC 2004 Now Now Now CPU 16 26 35 17 41 65 26 40 55 Disk 2 9 13 3 21 24 4 14 26 MSS 5 11 11 20 11 11 10 16 17 Evolution of computing resources

  12. Present status of pledged resources • Tier 0 at CERN • ALICE requirements satisfied, including peak for first pass reconstruction • Tier 1 and Tier 2 • As declared to LCG and presented to RRB • CAF not included

  13. Physics program • Flow analysis (TPC, HLT) • High pt physics • Nuclear modification factor direct  and 0,  (PHOS, TPC, HLT) • Di-jets, gamma-jets (PHOS, TPC, HLT) • Heavy flavour • Open charm production (TPC, ITS, HLT) •  production (TPC, TRD, HLT) • Ultraperipheral collisions (TPC, SPD+trigger detectors, HLT)

  14. Nuclear Theory • Relativistic heavy ion collisions and quark-gluon plasma • Initial state • Final Freeze Out • Collective, Fluid Dynamical properties (“Third flow component”) • Phase transition dynamics

  15. Personell - staff

  16. ALICE - budget

  17. HENP after 2001 • ALICE running plan • pp or pp-like run at 5.5 TeV • Light AA system • dA • Low energy PbPb • Another high energy PbPb • ALICE upgrades ? • CBM at FAIR/GSI ? • Astrophysics experiment ?

  18. 108 106 104 102 100 M2 (GeV2) 10 GeV 10-6 10-4 10-2 100 x J/ψ ALICE at LHC – Phase 2 SHLC: shutdown (2012 ?) + upgrade 2012 - 2015 • Depending on physics results • Upgrades: detectors, FEE, DAQ, trigger • Example: detector covering large rapidities • Probe initial partonic state in a novel Bjorken-x range (10-3-10-6): • nuclear shadowing, • high-density saturated gluon distribution ALICE PPR CERN/LHCC 2003-049

  19. CBM experiment at FAIR/GSI • Facility for Antiproton and heavy Ions Research • Planned commissioning: 2010 – 2015 • CBM experiment • super-dense baryonic matter • in-medium properties of hadrons

  20. Dense Matter in the Universe • Mergers of binary stars – the ultimate nuclear collision • evolution depends on the equation-of-state of the matter inside the star • large differences between normal neutron stars and selfbound stars • different pattern of mass transfer • observable via gamma bursts, gravitational waves, ...? in 2020? astro/-ph/0403374

  21. ISOLDE physics • Isotope Separator On-Line DEvice

  22. Physics program • Experiments at REX-ISOLDE • Mass 80 region:Neutron-rich nuclei approaching the doubly closed shell nucleus 78Ni • Mass 132 region:important for r-process calculations • Mass 230 region:Coulomb excitation -> collective features • Nuclear shape • Multi-quasiparticle excitations • Detectors • Gamma arrays like MINIBALL • Compact disc detector for the scattered beam • Theory • Extreme, low-density nuclear states • Few– and many-body systems

  23. Personell – staff (ISOLDE physics)

  24. Budget (ISOLE physics)