1 / 9

GridPP Collaboration Board

GridPP Collaboration Board. Wednesday 12 January 2005. Agenda. Minutes of Previous Meeting (14 July 2004) Actions arising CCLRC Investigate VAT exemption SL to notify CB of standard template talk for schools SL to provide briefing note for Tier-2 MoU Project Leader's report - Tony Doyle

gavin
Télécharger la présentation

GridPP Collaboration Board

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GridPP Collaboration Board Wednesday 12 January 2005

  2. Agenda • Minutes of Previous Meeting (14 July 2004) • Actions arising • CCLRC Investigate VAT exemption • SL to notify CB of standard template talk for schools • SL to provide briefing note for Tier-2 MoU • Project Leader's report - Tony Doyle • Project Manager's report - Dave Britton • Tier-2 Status – Steve Lloyd • Beyond GridPP2 – Tony Doyle • Beyond GridPP2 - Discussion • AOB • Next meeting (21 or 22 June ?) GridPP CB Meeting 12 Jan 2005

  3. Tier-2 Board Tier-2 Board Membership Chair: Steve Lloyd 4 Tier-2 Regional Management Board Chairs: Dave Colling, Roger Jones, Phil Clark, Jeff Tseng 4 Tier-2 Technical Coordinators: Owen Maroney, Alessandra Forti, Fraser Speirs, Pete Gronbech Production Manager: Jeremy Coles Tier-1 Board Representative: John Gordon User Board Representative: Roger Jones Deployment Board Representative: Dave Kelsey GridPP CB Meeting 12 Jan 2005

  4. Tier-2 MoU Separate MoUs in each Tier-2 between institutes gave local Chair authority to sign the MoU between GridPP and the 4 Tier-2 Centres. GridPP CB Meeting 12 Jan 2005

  5. Tier-2 MoU Status GridPP – Tier-2 MoU ScotGrid MoU SouthGrid MoU London MoU NorthGrid MoU Brunel Lancaster Durham Birmingham Imperial Liverpool Edinburgh Bristol Manchester Cambridge QMUL Glasgow Sheffield Oxford RHUL UCL RAL PPD Warwick GridPP CB Meeting 12 Jan 2005

  6. Hardware Posts As of 11 January 2005 GridPP CB Meeting 12 Jan 2005

  7. Experimental Shares Attempted to determine what the ‘fair shares’ of the Tier-2 resources are. e.g. Linear Collider Multiply each resource by HEP Share and experiment share (+ time/belief weight) and integrate over all institutes. GridPP CB Meeting 12 Jan 2005

  8. Experimental Shares Probably needs to be updated yearly If overall Tier-2 resources were used in these proportions then (on average) everyone's kit would be used for what it was bought for. GridPP CB Meeting 12 Jan 2005

  9. Status Challenge now is to deliver the resources and to be able to monitor and schedule them From GIIS – Some numbers are x2 too high (hyperthreading) (LCG only – doesn't include contributions to BaBar, CDF, D0) Number of UK Tier-2 'CPU's HEFCE SRIF2 Procurement issues Configuration Issues +930 at Tier-1 gives UK: 2381 CPUs out of 9122 in 94 sites in 31 countries GridPP CB Meeting 12 Jan 2005

More Related