Combined cleaning in IR3 - MD results and simulations

Combined cleaning in IR3 - MD results and simulations. Adriana Rossi R.W.Assmann , R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino, D. Wollmann. IR3 combined cleaning MD. Scope : Test cleaning efficiency when using IR3 for both momentum and betatron cleaning.

genna
Télécharger la présentation

Combined cleaning in IR3 - MD results and simulations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Combined cleaning in IR3 - MD results and simulations Adriana Rossi R.W.Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino, D. Wollmann CWG 18 July 2011

  2. IR3 combined cleaning MD CWG 18 July 2011 • Scope: Test cleaning efficiency when using IR3 for both momentum and betatron cleaning. • IR3 combined cleaning could be adopted if required for R2E. • Could reduce setup time. • Would reduce impedance. • Procedure: • After beam based setup (see G. Valentino) in IR3. • Close TCP3 and TCS3 as for betatron nominal settings (if possible), i.e. TCP @ 5.7 s, TCS @ 6.7 s. • If possible keep TCTs as for physics (to test higher leakage to exp.). • Open TCP7 and TCS7. • Perform betatron and momentum loss maps in the H plane. • Measurements performed: • Loss maps on horizontal plane, 3.5TeV with 1 nominal bunch, injection optics . • V collimators in IR7 left in since no vertical collimators in IR3. • Momentum loss maps could not be performed: beam dumped due to unmask-able BLM.

  3. IR3 combined betatron / momentum cleaning TCSM.A5R3.B1 TCSM.B5R3.B1 TCHSH.6L3.B1 TCSM.5L3.B1 TCSM.4R3.B1 TCP. A6L3.B1 TCSG.A5L3.B1 TCSG.B4R3.B1 TCSG.D5R3.B1 TCSG.C5R3.B1 TCP.6L3.B1 TCSG. 5L3.B1 TCSG.4R3.B1 TCSG.A5R3.B1 TCSG.B5R3.B1 Beam 1 Symmetric for Beam 2 TCLA.7L3.B2 TCLA.6L3.B2 TCLA.B5L3.B2 TCSG.4L3.B2 TCSG.5R3.B2 TCP.6R3.B2 TCSG.A5L3.B2 TCLA.A5L3.B2 TCSG.B5L3.B2 Beam 2 CWG 18 July 2011 • What we would have (+ TCLA’s) • What we could test (no vertical collimators in IR3) 10 s 6.7 s 5.7 s • Note that there are less passive absorber in IR3 (1 TCAP per beam) than in IR7 (3 per beam)

  4. Results for IR3 combined cleaning, H, injection optics ~1e-1 Setup apertures • TCP3 (H) 5.7 s • TCS3 (H,S) 6.7 s • TCLA3 (H,V) 10 s • TCP7 (H,S) 18 s • TCS7 (H,S) 21 s • TCLA7 (H,S) 24 s • TCP7 (V) 5.7 s • TCS7 (V) 8.5 s • TCLA7 (V) 17.7 s • TCT (H,V) 26 s • TCL, TCLI, TDI open B2 ~2e-2 ~1e-2 ~1e-2 • Main losses on TCP.6R3.B2 and TCSG.A5L3.B2 (skew) → Hierarchy? (TCP3 was tested to be the primary collimator prior measurements) • High losses at TCTVs right of IR1 (~1%) and IR8 (~2.6%) • IR7 and IR6 level CWG 18 July 2011

  5. SixTrack simulations with collimators as thought to be • TCP3 (H) 5.7 s • TCS3 (H,S) 6.7 s • TCLA3 (H,V) 10 s • TCP7 (H,S) 18 s • TCS7 (H,S) 21 s • TCLA7 (H,S) 24 s • TCP7 (V) 5.7 s • TCS7 (V) 8.5 s • TCLA7 (V) 17.7 s • TCT (H,V) 26 s • TCL, TCLI, TDI open B2 SixTrack simulations with H sheet beam hitting TCP3: cannot reproduce IR3 loss shapes, nor high losses in IR1/8, nor IR6 and IR7 level CWG 18 July 2011

  6. SixTrack simulations • TCP3 (H) 5.7 s • TCSG.A5L3.B2 5.7 s • TCS3 (H,S) 6.7 s • TCLA3 (H,V) 10 s • TCP7 (H,S) 18 s • TCS7 (H,S) 21 s • TCLA7 (H,S) 24 s • TCP7 (V) 5.7 s • TCS7 (V) 8.5 s • TCLA7 (V) 17.7 s • TCT (H,V) 26 s • TCL, TCLI, TDI open ~1e-1 Sum of results: sheet beam hitting TCP.6R3.B2 and TCSG.A5L3.B2 CWG 18 July 2011

  7. Summary and future work CWG 18 July 2011 • Results: • After standard beam based setup in IR3. • H betatron loss maps dumped both beams. • Measured loss map pattern different from usual: • Main losses on TCP.6R3.B2 and TCSG.A5L3.B2 (skew) → Hierarchy? But prior measurements TCP3 was moved in to verify it was the primary collimator. • High losses at TCTVs right of IR1 (~1%) and IR8 (~2.6%). • IR6 and IR7 and level. • Simulated loss map pattern could partly be reproduced by overlapping results from “hierarchy breakdown” and sheet beam hitting both collimators with highest losses. • Further study to interpret/reproduce data. • After analysis (simulations also with FLUKA to include showers) measurements should be repeated to validate scheme.