1 / 73

May 10, 2010

Presentation to the. May 10, 2010. Citizens’ Oversight Committee. Presented By : Bill Winslow Bernards’ Program Manager. Overview. Aerial Views of Chaffey College-Rancho Cucamonga Completed Projects 2002-2008 Completed Projects in 2007 Completed Projects in 2008

geri
Télécharger la présentation

May 10, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation to the May 10, 2010 Citizens’ Oversight Committee • Presented By: • Bill Winslow • Bernards’ Program Manager

  2. Overview • Aerial Views of Chaffey College-Rancho Cucamonga • Completed Projects 2002-2008 • Completed Projects in 2007 • Completed Projects in 2008 • Completed Projects in 2009 • Completed Projects in 2010 • Projects under Construction • Projects in Bid and Award • Projects in Design • Projects in Planning • Program Schedule • Status of Measure ‘L’ Funds COC Presentation May 10, 2010

  3. Chaffey Community College • Aerial View-1958 Rancho Cucamonga Campus COC Presentation May 10, 2010

  4. Chaffey Community College • Aerial View-2010 Rancho Cucamonga Campus COC Presentation May 10, 2010

  5. Completed Projects 2002-2008 • Renovate/Paint Auto Tech Lab • Infrastructure/Campus Theme • Environmental Impact Report • Renovate Athletics Office • Scoreboards • Snack Bar • Track & Field Timer • Stadium Flag Pole • Rad Tech Retrofit • San Antonio Comm. Hosp./CNA • Chino Master Plan • Vocational Education-Phase I • Wargin Hall-Phase I • Visitor’s Restroom/ADA Access • Science Complex Site work • Theater Fire Alarm • Bookstore Loading Dock • North Parking Lot Irrigation • North Parking Lot Landscaping • ATL Landscaping • Nature Preserve Fence • Central Plant, Phase I • College Drive • Softball Field • Fontana, Phase 2 • Wilson/College Dr. Intersection • Marie Kane Center for Student Services/ Administration • Theatre-Phase I • North Parking Lot • Science Complex • Berz Excellence Building • College Drive Landscaping • Maintenance Yard Drainage • Agricultural Demonstration Area • Skills Road Extension • Fire Lane/Science Site Lighting • New Marquee • Physical, Health, and Life Science • Health and Life Science Re-Roof • New Elevator Tower • Parking Lot 12 COC Presentation May 10, 2010

  6. Completed Projects in 2007 • Science Complex • Four Buildings – 27,000 sq. ft. – Classrooms, Lab Spaces • Berz Excellence Building • Two Story-14,738 sq. ft. – Classrooms • Marie Kane Center for Student Services/ Administration • Two Story-24,828 sq. ft. – Student Services • Ralph M. Lewis Center • 10,140 sq. ft. – Student Services/Classrooms COC Presentation May 10, 2010

  7. Completed Projects in 2007 Berz Excellence Building Marie Kane Center for Student Services/ Administration Science Complex Rancho Cucamonga Campus COC Presentation May 10, 2010

  8. Completed Projects in 2007 • Science Complex Science Complex Looking Northeast • Contractor: Soltek Pacific • Architect: Harley Ellis Devereaux • Completed: November 2007 • Scope: Four Buildings-Classrooms, and Lab Spaces-27,000 sq. ft. COC Presentation May 10, 2010

  9. Completed Projects in 2007 • Berz Excellence Building Berz Excellence Building Looking North • Contractor: RC Construction Services • Architect: Harley Ellis Devereaux • Completed: November 2007 • Scope: Two Story-14,738 sq. ft. -Classrooms COC Presentation May 10, 2010

  10. Completed Projects in 2007 • Marie Kane Center for Student Services /Administration Marie Kane Center for Student Services/Administration Looking North • Contractor: USS Cal Builders • Architect: GKK Works • Completed: December 2007 • Scope: Two Story-24,828 sq. ft.-Student Services COC Presentation May 10, 2010

  11. Completed Projects in 2007 Ralph M. Lewis Center Fontana Campus COC Presentation May 10, 2010

  12. Completed Projects in 2007 • Ralph M. Lewis Center Ralph M. Lewis Center Looking Northeast • Contractor: PCM Construction • Architect: Jorgensen Architects • Completed: February 2007 • Scope: 10,140 sq. ft. –Student Services/Classrooms COC Presentation May 10, 2010

  13. Completed Projects in 2008 • New Elevator Tower • New Elevator Tower for Accessibility from the VSS Building to the Marie Kane Center for Student Services/Administration • Parking Lot 12 • New Parking Lot for Accessibility to the Marie Kane Center for Student Services/Administration • New Marquee • New High Visibility Sign at the Main College Entrance • Physical, Health, and Life Sciences Renovation • Renovation/Modernization of Existing Classrooms • Health and Life Science Re-Roof • Installation of New Standing Seam Metal Roof COC Presentation May 10, 2010

  14. Completed Projects in 2008 Health and Life Science Re-Roof Parking Lot 12/ New Elevator Tower Physical, Health, and Life Sciences Renovation New Marquee Rancho Cucamonga Campus COC Presentation May 10, 2010

  15. Completed Projects in 2008 • New Elevator Tower New Elevator Tower Looking Northwest • Contractor: EDGE Development, Inc. • Architect: GKK Works • Completed: May 2008 • Scope: New Elevator Tower for Accessibility COC Presentation May 10, 2010

  16. Completed Projects in 2008 • Parking Lot 12 Parking Lot 12 Looking West • Contractor: EDGE Development, Inc. • Architect: GKK Works • Completed: May 2008 • Scope: New Parking Lot for Accessibility COC Presentation May 10, 2010

  17. Completed Projects in 2008 • New Marquee New Marquee Looking North • Contractor: Quiel Bros. Signs • Architect: HGA Architects • Completed: June 2008 • Scope: New Entrance Marquee Sign COC Presentation May 10, 2010

  18. Completed Projects in 2008 • Physical, Health, and Life Sciences Renovation Physical, Health, and Life Sciences Renovation Looking North • Contractor: PW Construction • Architect: WWCOT Architects • Completed: August 2008 • Scope: Interior Renovations/Modernization COC Presentation May 10, 2010

  19. Completed Projects in 2008 • Health and Life Science Re-Roof Health and Life Science Re-Roof Looking South • Contractor: Best Contracting • Architect: WWCOT Architects • Completed: August 2008 • Scope: New Standing Seam Metal Roof COC Presentation May 10, 2010

  20. Completed Projects in 2009 • Library Lawn/Fontana Phase II Landscaping • New Landscaping and Irrigation on the Fontana and Rancho Cucamonga Campuses • Physical Science Complex Roof Replacement • Installation of a New Standing Seam Metal Roof • Language Arts/Social Science-Energy Project • An Energy Conservation Project with New Lighting and HVAC Systems • New Air Handling Unit and Lighting • Fontana Phase III Parking Lot • New 459 Stall Parking Lot in Preparation for the New Academic Building COC Presentation May 10, 2010

  21. Completed Projects in 2009 • Data and Telecom Cabling • New Data and Fiber Cabling for Six Buildings • Visual and Performing Arts Complex • Renovation of Two Buildings and Construction of Two New Buildings COC Presentation May 10, 2010

  22. Completed Projects in 2009 Library Lawn Landscape and Irrigation Rancho Cucamonga Campus COC Presentation May 10, 2010

  23. Completed Projects in 2009 • Library Lawn Landscaping-Rancho Cucamonga Campus Library Lawn Landscaping-Rancho Cucamonga Campus Looking Northwest • Completed: August 2009 • Scope: New Landscaping and Irrigation • Contractor: Landforms Landscape Construction • Architect: Steven Frenken Landscape Architecture COC Presentation May 10, 2010

  24. Completed Projects in 2009 Fontana Phase II Landscape and Irrigation Fontana Campus COC Presentation May 10, 2010

  25. Completed Projects in 2009 • Fontana Phase II Landscaping-Fontana Campus Fontana Phase II Landscaping-Fontana Campus Looking Northeast • Completed: August 2009 • Scope: New Landscaping and Irrigation • Contractor: Landforms Landscape Construction • Architect: Steven Frenken Landscape Architecture COC Presentation May 10, 2010

  26. Completed Projects in 2009 Physical Science Complex Roof Replacement Rancho Cucamonga Campus COC Presentation May 10, 2010

  27. Completed Projects in 2009 • Physical Science Complex Roof Replacement Physical Science Complex Roof Replacement Looking West • Contractor: Cabral Roofing and Waterproofing Corp. • Architect: WWCOT Architects • Completed: August 2009 • Scope: New Metal Seam Standing Roof COC Presentation May 10, 2010

  28. Completed Projects in 2009 Social Science Building-Energy Upgrades Language Arts Building-Energy Upgrades Rancho Cucamonga Campus COC Presentation May 10, 2010

  29. Completed Projects in 2009 • Social Science Building-Energy Upgrades Social Science Building-Energy Upgrades Looking North • Completed : August 2009 • Scope: New Air Handling Unit • Contractor: Siemens • Architect: P2S Engineering, Inc. COC Presentation May 10, 2010

  30. Completed Projects in 2009 • Language Arts Building-Energy Upgrades Language Arts Building-Energy Upgrades Looking North • Completed : August 2009 • Scope: Installation of Lighting Upgrades • Contractor: Siemens • Architect: P2S Engineering, Inc. COC Presentation May 10, 2010

  31. Completed Projects in 2009 Fontana Phase III Parking Lot Fontana Campus COC Presentation May 10, 2010

  32. Completed Projects in 2009 • Fontana Phase III Parking Lot Fontana Phase III Parking Lot Looking South • Completed: August 2009 • Scope: Construction of a New 459 Stall Parking Lot • Contractor: Bogh Engineering, Inc. • Architect: HMC Architects COC Presentation May 10, 2010

  33. Completed Projects in 2009 Data & Telecom Ceramics Building Data & Telecom Music Building Data & Telecom Performing Arts Building Data & Telecom Fashion Building Data & Telecom Sports Center Data & Telecom Physical Science Building Rancho Cucamonga Campus COC Presentation May 10, 2010

  34. Completed Projects in 2009 • Data & Telecom Cabling Data & Telecom Cabling Looking North • Completed: November 2009 • Scope: Installation of New Fiber and Cabling for Six Buildings • Contractor: T & D Communications, Inc. • Architect: WWCOT Architects COC Presentation May 10, 2010

  35. Completed Projects in 2009 VPA Complex Building C Ceramics Building VPA Complex Building E Music Building VPA Complex Building F Performing Arts Building VPA Complex Building B Fashion Building F B C E Rancho Cucamonga Campus COC Presentation May 10, 2010

  36. Completed Projects in 2009 • Visual and Performing Arts Complex-Aerial View Rancho Cucamonga Campus COC Presentation May 10, 2010

  37. Completed Projects in 2009 • Visual and Performing Arts Complex-Fashion Studio Fashion Studio Looking East • Contractor: ProWest Constructors • Architect: HGA Architects • Completed: December 2009 • Scope: Renovation of Existing Building COC Presentation May 10, 2010

  38. Completed Projects in 2009 • Visual and Performing Arts Complex-Ceramics Studio Ceramics Studio Looking Northeast • Contractor: ProWest Constructors • Architect: HGA Architects • Completed: December 2009 • Scope: Renovation of Existing Building COC Presentation May 10, 2010

  39. Completed Projects in 2009 • Visual and Performing Arts Complex-Music Building Music Building Looking East • Contractor: ProWest Constructors • Architect: HGA Architects • Completed: December 2009 • Scope: Construction of New Music Building COC Presentation May 10, 2010

  40. Completed Projects in 2009 • Visual and Performing Arts Complex-Performing Arts Building Performing Arts Building Looking North and South • Contractor: ProWest Constructors • Architect: HGA Architects • Completed: December 2009 • Scope: Construction of New Performing Arts Building COC Presentation May 10, 2010

  41. Completed Projects in 2010 • Sports Center • New 22,000 sq. ft. Sports Center • Visual and Performing Arts North Fire Lane • Renovation of the existing fire lanenortheast of the Berz Excellence Building and south of the Language Arts Building COC Presentation May 10, 2010

  42. Completed Projects in 2010 Sports Center Rancho Cucamonga Campus COC Presentation May 10, 2010

  43. Completed Projects in 2010 • Sports Center-Aerial View Rancho Cucamonga Campus COC Presentation May 10, 2010

  44. Completed Projects in 2010 • Sports Center Sports Center Looking East • Contractor: EDGE Development, Inc. • Architect: NTD Architecture • Completed: February 2010 • Scope: Construction of New Sports Center COC Presentation May 10, 2010

  45. Completed Projects in 2010 Visual and Performing Arts North Fire Lane Rancho Cucamonga Campus COC Presentation May 10, 2010

  46. Completed Projects in 2010 • Visual and Performing Arts North Fire Lane Visual and Performing Arts North Fire Lane Looking West • Contractor: ASR Constructors, Inc. • Engineer: Associated Engineers • Completed: May 2010 • Scope: Renovation of Existing Fire Lane COC Presentation May 10, 2010

  47. Projects Under Construction • Visual and Performing Arts Landscape Addition • New Landscape and Irrigation • Estimated Completion: July 2010 • Physical Education Facility Gym Renovation • Renovation of 30,843 sq. ft. Building • Estimated Completion: October 2010 • Fontana Phase III Academic Building • New 30,400 sq. ft. Project • Estimated Completion: April 2011 COC Presentation May 10, 2010

  48. Visual and Performing Arts Landscape Addition • Visual and Performing Arts Landscape Addition • New landscape and irrigation surrounding the Visual and Performing Arts Complex • Granite cobblestone pavers • Benches • Estimated Completion: July 2010 • Architect: Soltis Landscape Services • General Contractor: Elite Landscaping, Inc. • Original Contract Amount: $ 247,770.50 COC Presentation May 10, 2010

  49. Visual and Performing Arts Landscape Addition Visual and Performing Arts Landscape Addition Rancho Cucamonga Campus COC Presentation May 10, 2010

  50. Visual and Performing Arts Landscape Addition • Progress Photos Removal of existing shrubs at Ceramics Studio. Looking East Trenching for existing mainline water connections. Looking South COC Presentation May 10, 2010

More Related