1 / 36

Need for integrated simulations: Integration of electricity supply and demand

Need for integrated simulations: Integration of electricity supply and demand. Kenneth Bruninx with Erik Delarue and William D’haeseleer. Basic principles of electricity generation. Electric power Travels at speed of light Is difficult to store

ghada
Télécharger la présentation

Need for integrated simulations: Integration of electricity supply and demand

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Need for integrated simulations: Integration of electricity supply and demand Kenneth Bruninx with Erik Delarue and William D’haeseleer

  2. Basic principles of electricity generation Electric power • Travels at speed of light • Is difficult to store → Supply must meet demand instantaneously • Network required for transport • High voltage – Transmission • Low voltage – Distribution Demand [MW] Time [h]

  3. Basic principles of electricity generation Different technologies used and scheduled to meet demand

  4. Technologies Electricity generation system is mix of • Dispatchable units • Non-dispatchable units • Often intermittent • Storage

  5. Technologies Dispatchable units: output can be activelycontrolled • Nuclear, coal, lignite • Rankine steam cycle • Large units ~1000 MW • Continuous flat operation (?) • Gas Combined Cycle • Braytongas cycle + Rankine steam cycle • η ≈ 50%-55% • Typical size: ~400 MW • Flexible operation • Gas turbine • Peak units, very flexible • Renewable Energy Sources (RES) • Biomass, hydro (basin)

  6. Technologies Non-dispatchable units: output cannot (or only limitedly) be controlled • Intermittent units • Variableoutput • Output is predictableonly to limited extent • Wind and solar photovoltaics (PV) • Zero marginal cost

  7. Technologies Variable output & limited predictability

  8. Technologies • Storage • Pumped hydro storage • Compressed Air Energy Storage (CAES) • Flywheels • Batteries • H2, CH4 • …

  9. Power plant scheduling Given portfolio of power plants, how to meet certain electricity demand? • At lowest variable cost • Significant amount can be non-dispatchable generation • Taking into account technical constraints of power plants • Taking into account safety margins • Dealing with uncertainties • Network restrictions, import/export This optimization problem is known as the unit commitment problem • Difficult to solve because of on/off nature of decision variables • Required to represent start-up costs and start-up behavior, minimum operating point, minimum up & down times

  10. Power plant scheduling Example of simplified unit commitment • Given set of power plants • Capacity, minimum operating point, efficiency, fuel price, start-up cost, minimum up & down time • Meet certain demand profile • Minimize fuel and start-up costs • Fuel cost dependent on load level • Technical constraints • Respect minimum operating point if on • Respect minimum up & down time Optimized with Mixed Integer Linear Programming (MILP) (Operations Research technique)

  11. Power plant scheduling Example of simplified unit commitment • Given set of power plants • Capacity, minimum operating point, efficiency, fuel price, start-up cost, minimum up & down time • Meet certain demand profile • Minimize fuel and start-up costs • Fuel cost dependent on load level • Technical constraints • Respect minimum operating point if on • Respect minimum up & down time Optimized with Mixed Integer Linear Programming (MILP) (Operations Research technique)

  12. Power plant scheduling • Consider power plants i • Consider time periods j • E.g., one week, hourly time steps: j = 1 … 168

  13. Power plant scheduling • How to meet demand at lowest cost? • Minimize • Supply = Demand With gi,jelectricity generation of plant i in period j [MW] and djelectricity demand in period j[MW]

  14. Power plant scheduling

  15. Power plant scheduling Fuel costs • Assume linear cost behavior between Pmin and Pmax • Other function possible, e.g., quadratic Linear : Fuel cost [€/h] c b ~ η δ Output, g [MW] Pmin Pmax

  16. Power plant scheduling • Deriving c and b from data previous table yields

  17. Power plant scheduling Startup costs • Bringing power online (from zero to 1) incurs a cost • E.g., amount of heat required to bring steam to appropriate temperature and pressure

  18. Power plant scheduling: an example Total installed capacity: 6520 MW One week period (168 h) • Peak demand = 5244 MW (95% of dispatchable capacity) • Given certain intermittent profile

  19. Power plant scheduling

  20. Power plant scheduling Results

  21. Challenges and issues:

  22. Challenges and issues: a paradigm shift Residual load in Germany in 2050

  23. Challenges and issues: a paradigm shift Yearly load duration curves of supluses due to fluctuating electricity supply

  24. Challenges and issues Flexibility will be required • Generation side • Storage • Interconnections • Curtailment • Demand side activation • Through smart grids • Demand side response

  25. Challenges and issues Activation of demand side • Modeling of demand response

  26. Challenges and issues Modeling of demand response • Cost based models • Centrally planned • Incentive payment to consumers (function of amount shifted) • Explicit modeling of flexibility • E.g., heating/cooling systems, transport (including storage) • Price based models • Time-of-use pricing (e.g., two tariff system), critical peak pricing, real time pricing • Demand elasticities • Own and cross price elasticities • Maximizing overall social welfare • Quadratically constrained programming or iterative piecewise linear optimization

  27. Challenges and issues Fixed demand -0.2 own-price elasticity Source: De Jonghe, Delarue, D’haeseleer, Belmans, 2011, PSCC

  28. Challenges and issues Electricity price -0.2 own-price elasticity Source: De Jonghe, Delarue, D’haeseleer, Belmans, 2011, PSCC

  29. Challenges and issues Source: EEX Spot prices

  30. Challenges and issues • Old situation: • Load drives generation • New paradigm: • Generation drives load • Consume when & where there is electricity generation

  31. Integrated modelling: a case study ‘Impact of intelligent thermal systems on electricity generation – a systems approach’ • Research questions: • Effect of DS flexibility on electricity generation • Cost • Carbon intensity • RES utilization • Quantify the usefulness of DS flexibility • Motivation: in literature • OR focus on DS: technology-based analysis • OR focus on SS: economics-based analysis (see example above) Here: integrated approach, where the (economic) flexibility stems from a technology-based model. • Ongoing research

  32. Integrated modelling: a case study Modelling approach: cost-based • Minimize • Supply = Demand With gi,jelectricity generation of plant i in period j [MW] and djelectricity demand in period j[MW] Optimization variable

  33. Integrated modelling: a case study Modelling approach: cost-based • Variable demand is sum of demand of all flexible devicesof all consumer groups • Constraints • Technology: peak power, stored heat • Comfort level

  34. Integrated modelling: a case study No flexibility 20% flexible demand

  35. Integrated modelling: a case study Challenges in modelling • Consumer behaviour • Attendance pattern determines optimal solution • Limited number of consumer groups currently considered (25) • Correct representation of the building stock and its energy storage potential • Problem size • computational effort rises as more flexible device

  36. Conclusions • Forms of RES are non-dispatchable • Intermittent: variability & limited predictability • Impact on dispatchable generation system • Increases flexibility requirements • Can be absorbed by flexible generation if limited • At higher penetration additional flexibility required • Can lead to negative instantaneous residual demand • Storage, interconnections, curtailment, flexible demand • New paradigm: generation drives load • Also other technical, economic and regulatory challenges