1 / 10

Colin Santulli Clean Vehicle Rebate Project Manager California Center for Sustainable Energy

Colin Santulli Clean Vehicle Rebate Project Manager California Center for Sustainable Energy. June 7, 2013. Over 25,000 CVRP rebates issued since 2010. CVRP Online: Interactive Rebate Map www.energycenter.org/CVRPRebateMap

gryta
Télécharger la présentation

Colin Santulli Clean Vehicle Rebate Project Manager California Center for Sustainable Energy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Colin Santulli Clean Vehicle Rebate Project Manager California Center for Sustainable Energy June 7, 2013

  2. Over 25,000CVRP rebates issued since 2010 • CVRP Online: • Interactive Rebate Map • www.energycenter.org/CVRPRebateMap • Maps current PEV adoption trends, creates geographic-specific reports • PEV Driver Survey • www.energycenter.org/PEV Survey • Demographics, charging and driving behavior data of +4K PEV drivers • CVRP Project Statistics • www.energycenter.org/ProjectStatistics • Time series of current PEV adoption trends; downloadable project data

  3. Rebate Distribution Report • Totals based on selected filters • AQMD • County • Utility • Zip Code • Total Rebates by dollar and vehicle type • Updated every 2 weeks

  4. Overview of Survey • Longitudinal study of plug-in electric vehicle (PEV) owners in California. Surveys distributed on a 6 month cycle. • Leverages owner information from the CVRP incentive database. • Research focused on vehicle use, charging infrastructure, charging behavior, and household demographics. • Third Round launched in May – 8,000 survey population, ~35% response rate.

  5. Survey Cohorts

  6. Survey Cohorts 4th and 5th Survey Rounds

  7. CVRP Round 2 Survey Results 92% expressed overall satisfaction with PEV

  8. CVRP Round 2 Survey Results

  9. CVRP Round 2 Survey Results

More Related