DEA 151: QUALCONN Modernization of Connection Performance Properties

PPI. TECHNOLOGY SERVICES. DEA 151: QUALCONN Modernization of Connection Performance Properties. Drilling Engineering Association. Brian Schwind, PE PPI Technology Services. Introduction: Need. Connections: 70% to 90% of Failures Ignored in Well Design!. Introduction: Industry Need.

guglielmo
Télécharger la présentation

DEA 151: QUALCONN Modernization of Connection Performance Properties

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PPI TECHNOLOGY SERVICES DEA 151: QUALCONNModernization of Connection Performance Properties Drilling Engineering Association Brian Schwind, PE PPI Technology Services DEA 151

  2. Introduction: Need Connections: 70% to 90% of Failures Ignored in Well Design! DEA 151

  3. Introduction: Industry Need • Unknown Performance of Connections • Pipe Performance exceeding connection ratings • Supply Requirements: Competition • Multi-source for meeting schedule requirements 3. Cost: Competition • As important as the tubular • Failure- Financial Loss • Liability- life and property DEA 151

  4. Introduction: Operator Experience 1. Failures are found two ways: • Laboratory- Rare for a test to go without performance issue • Field -Most costly / HSE implications 2. Operators have: • TotallyEliminatedFieldFailures through an integrated Qualification Program • Program involves applying what was tested, running per test, and applying within the limits of qualification • Independent verification of test results DEA 151

  5. Connection Reliability Environment:Test Load Envelope/ cycling, SLE, Failure Points, Temperature Installation:Torque, RPM, Thread Compound Application, running spec. Manufacturing(Complete Specifications) Foundation: Design Related(FEA, ISO 13679, Design Calcs) • Design: Test to Dimensional, Makeup, and Load Extremes • Database Provides Dimensional specifications. • Run Per Specification, within Service Load Envelope Qualification has Eliminated Failures! DEA 151

  6. QUALCONN Test Data: $50 Million invested The Connections you want! Product Line QualificationTubing & Casing: HPHT: Asia, Europe, North America CRA: 13% Cr, 22% Cr, 28 Cr, C-276, high nickel Deep Water: Large Diameter/ high rate wells Cutting Edge and Conventional Wells DEA 151

  7. Connection Test DataCasing Design: Detailed Graphical Results Specimen Test Data: Define Service Load Envelope 90+% of Drilling Team DEA 151

  8. Project Concern: Resolved DEA 151

  9. Project Schedule: Finalize Database Structure Finalizing Acquire test data June-November Coordinate Software June- December Coordinate Suppliers June-December Review/ authenticate data June- December Request additional data September- December QC QUALCONN /review October-December Finalize data presentation November-January DEA 151

  10. QUALCONN Project Benefits Short Term: • Profit from $50 MM Testing performed over 15+ years • Performance Options, Delivery Requirements • Save Time: One Stop for Objective Connection Data • Address Deepwater, Modern Performance Properties Long Term: • Network, Leverage, and Direct $7MM Product Development Effort • Upgrade Casing Design Program: Include Connectors • Lower Procurement Cost/ Reduced Trouble Time DEA 151

  11. QUALCONNSuppliers Objectives Highly Leveraged Project Cost- Capture Learnings Unified Customer Voice Access to new markets- new users Emphasize the importance ofconnectionperformance Reliability Testing-Available to entire company-MEM Promotion! DEA 151

  12. QUALCONN Operator Objectives Save Money! Quantify Connection Performance- Capture Learnings Integrate into Well Design: Schlumberger/Landmark Primary Cause of Failure- Eliminate! Available to entire company-EPOM Access to new sources-schedule & performance Emphasize the importance of connection performance Benefit from experience of others-do not re-invent the wheel! Address Connections! DEA 151