1 / 10

OTTAKRINGER

OTTAKRINGER. Ottakringer is one of the biggest brewing manufacturer in AUSTRIA. Members of group B0815: David GIEFING Florian HAGMAIR David SCHEFFEL Philipp ZWICKLHUBER. Ottakringer. Managment Control System.

guy-pruitt
Télécharger la présentation

OTTAKRINGER

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OTTAKRINGER Ottakringer is one of the biggest brewing manufacturer in AUSTRIA Members of group B0815: David GIEFING Florian HAGMAIR David SCHEFFEL Philipp ZWICKLHUBER

  2. Ottakringer

  3. Managment Control System To controll the output of each boiler is enough to know for the managment about the efficency in the company!!!! The most likely used system in the Ottakringer brewery: Result control • Result controls involve: • Establihing results mesasures that minimize undesirable behaviour • Establishing performance targets • Measuring performance • Providing rewards or punishment Ottakringer

  4. 2007 Forecast for 2015 108 l per capita 90-100 l per capita Planning for the future The beer consum will DECREASE! • Corrective measures • Use the EM 2008 for advertising purpose • Make beer more trendy for younger people • Different beer flavours • Carried out measures • Adaption of the 16er Blech especially for younger people • Sponsoring of a famous football club • Funny games at opening a beer bottle (the Pflop game) Ottakringer

  5. Two-stage allocation process Ottakringer

  6. Ottakringer

  7. Ottakringer

  8. We are trying to explain the decission tree with a simple excample: We have the decisions of increase, decrease, or stagnate the production, and the market also reacts, by a higher, lower, or an equal demand. Ottakringer

  9. How to increase the production? There are two options to increase the production: To take over a smaller competitor (option A): fast increase in production, but not very efficient To add a new production facility (option B): efficient production, but more time is needed to build it

  10. Comparison of the two options with a 8 year horizon • Use of NPV and IRR:  Option B is to prefer!  A new production facility should be build in order to increase the output

More Related