1 / 38

Integrated Development Environment - Output

Integrated Development Environment - Output. SITES SOFTWARE APPLICATION SEMINAR. __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS. IDE Concept. File management Data entry Output viewing and interpretation

Télécharger la présentation

Integrated Development Environment - Output

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Development Environment - Output SITES SOFTWARE APPLICATION SEMINAR __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS

  2. IDE Concept File management Data entry Output viewing and interpretation Comparison of alternatives

  3. Global Watershed Data

  4. Watershed Schematic Single watershed and site

  5. Edit Structure Right-click icon

  6. Watershed Information

  7. Structure Table

  8. Watershed Data

  9. PS Rainfall

  10. AS Rainfall Rainfall depth, distribution, duration for SDH & FBH

  11. Pool Data

  12. PS Type

  13. PS Inlet

  14. PS Conduit

  15. Valley Elevations

  16. AS Crest Options

  17. AS Crest Data

  18. AS Inlet Template 220’ 120’ 100’ 2’ 2.2’

  19. AS Exit Template

  20. AS XSC

  21. AS Materials 0.02mm = 0.0008”

  22. AS Materials Plot ML Sandstone Shale

  23. Fill • AS overexcavated a 0.5’ and backfilled with topsoil • Describe backfilled topsoil

  24. Topsoil PI= 10, 23% clay erosion-resistant topsoil

  25. Output Option

  26. Open File 5 files for 5 AS widths

  27. Build File

  28. View Summary Table

  29. Specify Summary Fields

  30. Summary Variables

  31. Summary Table Rows or columns 45 variables

  32. Summary GraphicsAS Width vs Integrity Distance Definite change in integrity distance 60’–70’ feet AS width. AS Integrity Distance AS Width

  33. Select File • Click 70’ AS Width row in summary table • Line highlighted • Click “View Graphs” button

  34. AS Erosion Plot – 70’ 70’ AS

  35. AS Erosion Plot – 60’ 60’ AS

  36. Material Properties

  37. Plot List

  38. End

More Related