1 / 16

OmegaPS Analyzer

OmegaPS Analyzer. New Functionality in Release R4.4 OUGM 2013 Graham Brum. Major Functions Added. Scheduled Maintenance Tasks QTT at LOM1 and OnPE SRSF Months Per Year hierarchy XML Data Files Single Item Spares – Multi-Item Extended “Cost Per” Report Initial Buy Report.

heidi
Télécharger la présentation

OmegaPS Analyzer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OmegaPS Analyzer New Functionality in Release R4.4 OUGM 2013 Graham Brum

  2. Major Functions Added Scheduled Maintenance Tasks QTT at LOM1 and OnPE SRSF Months Per Year hierarchy XML Data Files Single Item Spares – Multi-Item Extended “Cost Per” Report Initial Buy Report Slide

  3. Scheduled Maintenance • Add task details for • Calendar based tasks • Operational Unit based tasks • Operational demands for Scheduled spares replacement Slide

  4. SM R&O can be done at any LOM • On-PE tasks are used to “Inspect” the PE - CBM • Scheduled (Calendar) • Scheduled (Operational) • The LRU is R/R at On-PE when condition is met • The removed LRU can be sent to any LOM for repair, R&O Slide

  5. Model for SM • Total SM Mean Hours per Month = MHRSM(Op) + MHRSM(Cal) • MHRSM(Op) = Tasks per Month * Mean Task Time ((TOHM(PE)/MTBSM(Op)) * DC * QinPE) * MTSM(Op) • MHRSM(Cal) = Monthly Hours PE * QPE (MTSM * PETPM* QinPE) * QPE PETPM based on MTBSM MB (e.g. Weeks = 4) Slide

  6. Slide

  7. Quantity of Techs Trained • assigned to: • LOM1, or • On PE at First Line sites • Uses Labour Rates as defined for each level Slide

  8. SRSF • Site Reliability Stress Factor • Released in R4.3.2 • Allows for Reliability (MTBF) adjustment for: • a Part • at a Site • Multiplier adjustment to MTBF when demands are generated a that specified site for the associated part Slide

  9. Select SRSF button Opens form Set SRSF to adjust MTBR for an item at a site Slide

  10. Months Per Year Hierarchy • Months per year operating for PE is limited to only operating sites • Can be assigned at three levels: • Operating months for the PE • Operating months for the Site • Default value for all PE/Sites • Model uses the ‘best’ value from Default, Site, PE Slide

  11. XML Transfer Files • Data Files: • costs; echelon; structure; stock; STE • Result Files: • results; labour; spares; log • Project Transfer File: • Every data element in the project • Used for transfers between Analyzer and OSAM models. Slide

  12. Example Results.xml Results.xml viewed using XML Notepad 2007 from Microsoft Slide

  13. Multi selection of Single Item Sparing runs Select one or many items to include Sort by clicking column headers Select method for Target Availability. Manual displays graph for each item Slide

  14. Extended “cost-per” LCC reports • A cost breakdown report by Part in the configuration • Can select the ‘denominator’ • LCC • Per PE • Per Operating Unit • Per Failure • Others can be added in the future • Suggestions……? Slide

  15. Initial Buy Sparing report Slide

  16. Future Development • ASOAR -> APAU -> DATM • Design Availability Target Model • MHLH -> ADES -> TLAS • Through Life Availability Simulation • LORA2 Linear Programming research • Extended Task Modelling • Business Case Analysis LCC/TLC Cost Breakdown Structures Slide

More Related