1 / 13

E&P STORM WATER OVERVIEW Domestic Onshore Energy

E&P STORM WATER OVERVIEW Domestic Onshore Energy. May 10, 2005. Road to Domestic Energy. Road to Domestic Energy: Geological & Geophysical. 1 st look at subsurface Define geologic target using surface geophysical equipment Subsurface driven. The Road to Domestic Energy: Land Leasing.

hellerj
Télécharger la présentation

E&P STORM WATER OVERVIEW Domestic Onshore Energy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005

  2. Road to Domestic Energy

  3. Road to Domestic Energy: Geological & Geophysical • 1st look at subsurface • Define geologic target using surface geophysical equipment • Subsurface driven

  4. The Road to Domestic Energy: Land Leasing • Leases have terms, penalties, deadlines and a expiration date that drives a project timeline • Leases have multiple surface and subsurface owners • Split Estates; surface and mineral ownership different • Multiple mineral lease agreements and requirements • Competitive situation • The lease situation drives our clock

  5. The Road to Domestic Energy: Permitting • There are numerous permit considerations • Private • State • Federal • Oil & Gas Agency • Drilling • Construction • Pipeline ROW • Environmental Protection • Air • Water • Waste • Historical & Cultural • Vegetation & Wetlands • Wildlife

  6. The Road to Domestic Energy: Construction • Exploration or development well • lease road • well pad • Access Right of Ways have to accommodate environmental and surface conditions • Allow for: • Surface sensitivities • Landowner requests • Surface structures • Balance surface conditions to reach subsurface target

  7. The Road to Domestic Energy: Production If Successful • Well finalized • Rig moves off • Production equipment installed • O&G to sales and water to disposal • Drill site reduced and reseeded • “Foot Print” reduced If Unsuccessful • Plug & Abandon • Restore location

  8. Storm Water Comparison: Real Estate vs. Oil & Gas = Real Estate Development Oil & Gas Development • Static Plan • Blueprint Designed Upfront • Construction Follows Blueprint • Real Estate is All Surface • Dynamic Plan • Design As We Go • Each Well Tells a Geologic Story • Oil & Gas is Sub-Surface Dependent

  9. Real Estate Surface Use Driven Land Owned Timeline more Flexible Planning Certainty Metropolitan/Centralized Single Site SW Administration Oil & Gas Subsurface Driven Land Leased Timeline Is Critical Uncertainty Remote/Decentralized Scattered Multi Site SW Administration Storm Water Comparison: Real Estate vs. Oil & Gas Because of differences E&P needs regulatory flexibility “One Rule Does Not Fit All Industries”

  10. Cost Current State Future State • US Drilling Wells: 30,000 per year • SWPPP Implementation: $5,000 to $15,000 per well • Well Construction Size: 2 to 10 acres • Government • Recordkeeping – Inspection – Monitoring • Permit approvals timeline increases • Staff • Administrative burden • Industry • Increased “notice of intent” filing • Delayed NOI approval • Annual cost burden $150-$450 million* • Limited qualities resources • Lease expiration risks are real $ $ $ *Refer to Department of Energy 2005 Cost Impact Study

  11. Summary – Take Away • Intent of Storm water regulations are to protect surface waters from sediment and erosion runoff created by construction activities • Covered Oil & Gas Process • Comparisons/Differences between Oil & Gas and Real Estate • Stormwater Regulations Are Not Manageable For Oil & Gas

  12. Conclusion – Take Away There is a better alternative than the proposed stormwater rule change: • No Storm water permit • Implementation of RAPPS for all Oil & Gas construction will control sediment and erosion runoff • Implementation of RAPPS for all Oil & Gas construction

  13. E&P STORM WATER OVERVIEW May 10, 2005

More Related