AGIFORS CREW MANAGEMENT CONFERENCE 27th-30th May,2003

AGIFORS CREW MANAGEMENT CONFERENCE 27th-30th May,2003. Introduction Royal Air Maroc Fleet Route structure Crew member Statistics Software tools Crew Planning Process. SUMMARY. RAM was Created on 1957 (1 DC3, 100 employees). Now : 5732 employees (include 1348 Crew members).

hilliard
Télécharger la présentation

AGIFORS CREW MANAGEMENT CONFERENCE 27th-30th May,2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGIFORS CREW MANAGEMENT CONFERENCE 27th-30th May,2003

  2. Introduction Royal Air Maroc Fleet Route structure Crew member Statistics Software tools Crew Planning Process SUMMARY

  3. RAM was Created on 1957 (1 DC3, 100 employees). Now : 5732 employees (include 1348 Crew members). 72 destinations, 29 countries. 5000 flights per mounth. 11000 total flight time hours. Type of flight : 84% Regular, 14% Charter, 2% Cargo. Alliance/code sharing : Delta, Air France, Iberia, Gulf Air, TunisAir. Partners : SOTORAM (Hotels, Catering), SNECMA (Aircraft Maintenance), FedEx (cargo). Introduction

  4. Royal Air Maroc Fleet Fleet Total Sub type B737-200 02 B737-400 07 73S B737-500 06 • Future introduction of Fleet /Sub type : • 1 Boeing 737-800 for July 2003 • 2 Airbus A321 for Nov 2003 • 2 Boeing 737-800 for Feb 2004 • 2 Airbus A321 for 2006 • Additional 19 B737 will be delivered between 2004 and 2012. B737-700 04 73C B737-800 04 B757-200 02 76C B767-300 02 744 B747-400 01 TOTAL 28 52

  5. Route structure Domestic North of America Europe Middle East Africa

  6. One BASE for Pilot = CMN Crew member Statistics 73S 73C 76C 744 Captain 83 54 26 7 Pilot 118 56 30 7 • 5 BASES for Cabin Crew NDR CMN RAK AGA TNG 21 TOTAL 775 103 48 20 Total Pilot = 381 Total Cabin Crew = 967

  7. Crew Planning : SBS International system (UDB/PAIR/LINES) used since Nov 1997, Maestro Lines Dec 2003, Maestro Pair 2004. Crew Tracking : SBS International system (Maestro Crew) implementation in progress « deadline Sep 2003 ». Flight schedule and Ops Control : Lufthansa system (NetManager, NetOps) used since Mars 2000. Software tools

  8. Crew Tracking For M+1 Crew Planning Process SBS PAIR SBS LINES 1 5 18 24 30 Flight Schedule (From Lufhtansa system) Pairing building Building assignment crew Lines MANUEL PROCESSUS DB SBS PILOTS 73S PILOTS 73C Nonfly assignment Standby PILOTS 744 /76C Cabin Crew Pairings Publishing Indivudual Line Crew Planning For M+n (n>=1)

  9. Crew Planning Process(second part of 2003 ) 5 10-15 18-24 Flight Schedule • Pairing assignment • Reserve assignment • Reassignment after pairing update in Maestro Crew Pairing Generation (usual process) Publishing of actualized schedules UDB MAESTRO LINES PAIR Ad-hoc systems connected to the Maestro DB LEG FILE DB Pairings MAESTRO CREW LEG FILE • DB update for schedule period+1 • Correction and update of pairings schedule period+1 • Management of current schedule period Change message (e.g. equipment) Changes to pairings are treated in Maestro CREW

  10. Thank you for your attention