1 / 7

Status: CCC, LDA

Status: CCC, LDA. ATCalMZ Montagsmeeting. 29.04.2013. Vidyo -Meeting: 11th April 10:30 o’clock About the CCC and TLU upgrades David Cussans will give us the TLU VHDL code, so “easy” implementing Two possibilities: Baseline software or fallback hardware (or switched) Timeline July 2013.

holly-wynn
Télécharger la présentation

Status: CCC, LDA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status: CCC, LDA ATCalMZ Montagsmeeting 29.04.2013

  2. Vidyo-Meeting: • 11th April 10:30 o’clock • About the CCC and TLU upgrades • David Cussans will give us the TLU VHDL code, so “easy” implementing • Two possibilities: • Baseline software or fallback hardware(or switched) • Timeline July 2013 AIDA Meeting 7

  3. Rouven and I • 22.04.-24.04 • CCC worksgreat after onebigissue. • 50MHz insteadof 40MHz clock • 3 Layer-Readoutworkswithour CCC andour Fan-Out CCC DESY Support 5

  4. Rouven and I CCC DESY Support 5

  5. Passive PCB: 1. Wing with 32 HDMI connectors (almostfinished): LDA Layout 99mm 367,5mm 1

  6. Passive PCB: 2. Central module with 32 HDMI connectors (almost finished): LDA Layout 99mm 365mm 2

  7. LDA Layout Active PCB: 3. Daughter module: FPGA FPGA FPGA FPGA RJ45 80mm MARS SD HDMI-CCC 300mm 3

More Related