An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Direction de la stratégie et du développement durable SECURITY IN TUNNELSStudy Case

  2. TUNNELS Tunnel Maurice Lemaire

  3. TUNNEL Maurice Lemaire • Largest tunnel within French boundaries ( 6950 m ) • Initially built for rail use ( 1937 ) • Modified to road tunnel ( 1967 ) • Single tube, low traffic ( 3500 daily ), low toll rate

  4. TUNNEL Maurice Lemaire

  5. TUNNEL Maurice Lemaire

  6. TUNNEL Maurice Lemaire • March 1999 : Mont Blanc disaster • December 1999 : first security study • March 2000 : tunnel is closed for HGVs • 2001 – 2002 : security project • 2004 : project approved • April 2004 : tunnel is closed

  7. TUNNEL Maurice Lemaire Smoke evacuation Existing tunnel Security tube

  8. TUNNEL Maurice Lemaire

  9. TUNNEL Maurice Lemaire Project cost : 180 M€ - 4 years works • Concession 2022 - > 2068 • Toll rates x 2 • State and Region subsisies ( 35 M€ )

  10. TUNNELS FURTHER DETAILS : TML : André THIBOUD a.thiboud@aprr.fr