DOE Office of River Protection DOECAP TSDF and Laboratory Hanford Site Status Report

DOE Office of River Protection DOECAP TSDF and Laboratory Hanford Site Status Report. Jeff Cheadle, ORP ASP 2010 Workshop 20-23 September, 2010 Seattle, Washington. Hanford Site Map. DOE ORP Mission Statement.

iman
Télécharger la présentation

DOE Office of River Protection DOECAP TSDF and Laboratory Hanford Site Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DOE Office of River Protection DOECAP TSDF and Laboratory Hanford Site Status Report Jeff Cheadle, ORP ASP 2010 Workshop 20-23 September, 2010 Seattle, Washington

  2. Hanford Site Map

  3. DOE ORP Mission Statement Our mission is to retrieve and treat Hanford’s tank waste and close the tank farms to protect the Columbia River.

  4. DOE ORP Prime Contractors • Bechtel National, Inc. (BNI) • Advanced Technologies and Laboratories International, Inc. (ATL) • Washington River Protection Solutions (WRPS)

  5. RPP System Plan 5 Process Flow Diagram

  6. Waste Treatment and Immobilization Plant

  7. WTP Analytical Laboratory

  8. WTP Analytical Laboratory

  9. BNI Off-Site Commercial Laboratories • BNI utilizes two DOECAP laboratories for industrial hygiene analyses • BNI utilizes a laboratory for glass formulation research which is not a DOECAP participant

  10. BNI Off-Site TSDF • BNI does not utilize an off-site TSDF • BNI has contracted WRPS to dispose of hazardous industrial wastes

  11. RPP System Plan 5 Process Flow Diagram

  12. 222-S Analytical Laboratory

  13. 222-S Analytical Laboratory

  14. 222-S Analytical Laboratory • ATL provides routine analytical services for day to day tank farms operations (AIHA and WSDOE accredited) • WRPS performs analytical process development and administers 222-S complex operations (AIHA accredited)

  15. 222-S Laboratory Standards • For off-site laboratories, ORP accepts the DOECAP QSAS as the quality requirements • For DOE labs which service the Hanford site (222-S, WSCF, 325-S, future WTP lab), the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) is the preferred set of requirements

  16. Unique Analytical Needs • Industrial Hygiene Vapor Analysis • General Process Chemistry • Aluminum Dissolution (gibbsite, garnet) • Separation, Stabilization and/or Treatment of Selected Waste Streams • Tank Corrosion Studies • Analytical Support for Waste Tank Retrieval • Solids Analysis

  17. WRPS Off-Site Commercial Laboratories • WRPS utilizes five DOECAP laboratories for industrial hygiene or environmental sample analyses • WRPS contracts two laboratories for specialty industrial hygiene and vapor analyses which are not DOECAP participants

  18. Issues with Commercial Laboratories • Limited number of vapor analyte services • Few laboratories can accept potentially radioactive vapor samples • Turnaround time • Laboratory stability

  19. Qualified DOECAP Laboratory Auditors • WRPS provides one DOECAP laboratory auditor • WRPS has one DOECAP auditor in training

  20. Future DOECAP Laboratory Participation • Provide audit support for laboratories used by ORP contractors • Provide support for revision of the QSAS and checklists

  21. DOECAP Laboratory Points of Contact • Jeff Cheadle, DOE ORP • Glen Clark, WRPS

  22. Radiological TSDF • WRPS utilizes Perma-Fix Northwest as an off-site radiological TSDF • WRPS participates in DOECAP audits of Perma-Fix Northwest

  23. Non-Radiological TSDF Audits • WRPS utilizes off-site, non-radiological TSDFs for tank farm, 222-S laboratory and contracted WTP hazardous wastes • WRPS has a documented audit program to assess off-site TSDFs

  24. Qualified DOECAP TSDF Auditors • WRPS provides two DOECAP TSDF auditors

  25. DOECAP TSDF Points of Contact • Jeff Cheadle, DOE ORP • Judith Nielsen, WRPS

  26. ARRA Funded Projects • WTP ARRA funds directed toward accelerating construction schedule • Tank farm infrastructure • 242-S evaporator upgrades • Waste feed infrastructure • Effluent Treatment infrastructure • 222-S infrastructure • 222-S instrumentation upgrades