An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FOOTHILL MUNICIPAL WATER DISTRICT Recycled Water Project Board Workshop May 20, 2013

  2. Outline • Past /Present • Drivers • Project Background and Description • Benefits • Present • Benefits and Partnerships • Project Alternatives • Hydrogeologic Modeling with Percolation Test • CEQA Plus and Title 22 • Raymond Basin Management Board • Future • Budget and Funding • Schedule • Next Steps • Design Bid Build or Design Build Operate • Schedule

  3. Driver – Senate Bill SBX7-7 • Water suppliers to increase water use efficiency • Urban Water Conservation • Reducing per capita 10% by December 31, 2015 • Reducing per capita 20% by December 31, 2020 • Effective 2016 urban retail water supplies not meeting water conservation requirements are not eligible for State water grants and loans • The recycled water program assists in meeting this requirement

  4. Driver – Delta Conveyance • Delta Steward Council – May 16, 2013 • Adopted FINAL Delta Plan • Certifies Programmatic EIR • Adopted Regulations to Implement Policies of Delta Plan • Additional pressure for assurances to reduce reliance on Delta Conveyance • Senate President pro Tem Darrell Steinberg • Sunne McPeak from CA Emerging Technology Fund • Environmental Groups • 2nd Driest Year in Nor. Cal and Colorado River • Potential Shortages in 2 to 3 years

  5. Background – 2007-2009 • Master Plan put on hold second interconnection • Water Resources Plan prioritized developing reliability

  6. Background – 2011 and 2012 • Feasibility study approved by SWRCB • Reviewed 17 Alternatives • Narrowed down to Alternative A-6, MBR plant near Oak Grove Drive at 0.25 MGD recharge at John Muir High School • Two Firms hired to develop then review regulations and costs • Costs dropped based on less purple pipe

  7. Background - 2012 • Cal Poly Pomona began working on project in August 2012 – Field of Green • IRWMP process began in September 2012 • November 2012 Board authorizes proceeding with hydrogeologic evaluation, CEQA Plus, and Program Management services and payment of fee for grant application

  8. Background - 2013 • January 2013 - Board adopted resolution regarding WaterSMART Grant • March 2013 - Board authorized consulting services for conceptual report for Title 22 • March 2013 - Draft groundwater recharge regulations changed • April 2013 - Labor Compliance resolution adopted by Board • April 2013 - Board approved amendment to hydrogeologic modeling agreement for two other modeling runs

  9. Recycled Water Use in Area • Los Angeles County Sanitation District • La CañadaFlintridge Country Club • City of Glendale/LADWP • Landscape Irrigation • City of Burbank • Landscape Irrigation • Fire Fighting • Descanso Gardens and City of Pasadena • Verdugo Hills Golf Course MBR • Claremont Colleges MBR

  10. Description • Watershed approach to developing recycled water • Construction of a 0.25 MGD MBR plant • Recharge to groundwater basin and receive credits • Stormwater and urban runoff capture, treatment, and recharge • Reduce carbon footprint and lower greenhouse emissions • Conservation and education outreach component

  11. Project Alternatives

  12. Recycled Water Flow

  13. Benefits of Recycled Water Project • Enhance local supply and reduce dependency on imported water • Reduction in greenhouse gases and energy usage • Demonstrate watershed approach to developing local supplies and benefitting the community • Water Education • Watershed Integrity and Health • Public Outreach • Support of stakeholders – city, school, church, Sanitation Districts, County Public Works

  14. Quantified Benefits • Recharge Recycled Water: 280 AFY • Other Recharge: 38 AFY average • Estimated Stormwater Capture: 15 AFY • Estimated Urban Runoff Capture: 23 AFY • Barren Land: Half Acre Improvement • Energy Savings: 600 Megawatts • Enough for 85 Southern California homes annually

  15. Project Details - Partnerships • La CañadaUnified School District and City of La CañadaFlintridge: • Athletic fields • Stormwater and urban runoff capture • Cal Poly Pomona: Civil Engineering Department, Department of Landscape Architecture and Department of Urban and Regional Planning • Preparation of a 3D model of infiltration galleries • Development of drought tolerant landscaping for both MBR and LCHS sites • Development of a conservation and educational component to the Project • Undergraduate Development

  16. Project Support • Congresswoman Judy Chu • Congressman Adam Schiff • Assemblymember Mike Gatto • Los Angeles County Supervisor Michael D. Antonovich • Metropolitan Water District of Southern California • Los Angeles County Sanitation District • Los Angeles County Department of Public Works • Council for Watershed Health • Arroyo Seco Foundation • La CañadaUnited Methodist Church • La CañadaUnified School District • City of La CañadaFlintridge • Cal Poly Pomona

  17. Hydrogeologic Model • 3 areas modeled: • Athletic fields • Flint Creek Wash • Behind Devil’s Gate Dam • Results: • All 3 alternatives achieve CDPH minimum of four months retention time from active wells. • All alternatives do not exceed the RWC of 20% over a 120-month period.

  18. Hydrogeologic Model - Percolation Tests 4 feet per day average percolation

  19. CEQA Plus • Initial Study to be distributed June via FMWD website, via email notice to Board packet distribution list which includes newspapers and blogs, public agencies, other entities • Workshop will be scheduled for 30 days from release of document • Recommended action at August Board meeting

  20. Title 22 – Conceptual Report • Conceptual Report drafted on May 9, 2013 • Provides: • Summary key requirements or topics, • References to Title 22 and FMWD method of compliance • All items are achievable - no fatal flaws with the project

  21. Raymond Basin Management Board • Originally stormwater and urban runoff to be captured was to be credited to account • RBMB has stated no longer able to provide 100% credit • RBMB willing to provide some capital contribution

  22. Estimated Project Budget Total: $2,935,300

  23. Per Acre-Foot Cost • Assume 280 Acre-feet of sales • Receive IRWMP and USBR grants • Principal = $1,185,300 • 30 year term • 3.0% interest rate Cost per Acre-foot = $810

  24. Per Acre-Foot Cost – Above Scenario Over time, difference increases from $57 per acre-foot to $426 per Acre-foot Assume 3% inflation factor

  25. 280 AF sales • $1.5 million IRWMP Grant • $300,000 USBR Grant

  26. IRWMP Grant • Initial presentation September 2012 • For $1.45M • Ranked #1 in Subregion and #3 in Region • Application submitted to State in March 2013 • 50% of capital costs of approximately $3 million • Results October 2013

  27. USBR WEEG Grant • Submitted grant January 2013 • For $300,000 • Only infiltration galleries portion • Recycled water plant construction not allowed under this type of grant • Results June 2013

  28. Other Potential Funding • USBR • Title XVI Program • CalFed Funding • MWD LRP - Up to $250/AF of production • MWD Foundational Action Funding Program - $500k • SWRCB Low Interest Loans • iBank Low Interest Loans • Internal FMWD Funding • Water Sales • District Revenues/Reserves

  29. Current Status • Feasibility Study Completed – accepted by SWRCB • Percolation Testing – complete • Basin Hydrogeologic Modeling – complete • CEQA – in process • Title 22 Conceptual Report – in progress • WEEG application submittal – complete • IRWMP application submittal – complete • Fields of Green project – complete • Appraisal for easement – complete • Status meetings with various entities – in progress • Contract negotiations – in progress

  30. Next Steps • Release Initial Study - Late June • Public Hearing - Mid July • CEQA Finalization - August Brd. Mtg • Finalize agreements for • Raymond Basin Management Board • Los Angles County Sanitation District • La Cañada United Methodist Church • La CañadaUnified School District • Sampling of LACSD Sewer for Preliminary Design

  31. Preliminary Design • 30% Design • Scope of Services • Treatment (Primary, Secondary, Tertiary) • Chemical Feed System • Instrumentation and Controls • Hydraulics • Site Layout • Design Standards • Architectural Programming • Discharge Design • Cost Estimate • Project Delivery Recommendation (DBBO or DBO)

  32. Implementation Schedule