1 / 11

E Waste Management – Uganda’s Journey

Forum on Environmentally Sound Management of E-waste in Latin America Montevideo, Uruguay: 12 March, 2014. E Waste Management – Uganda’s Journey. Smart Sustainable Cities - 2014. Dickson Kwesiga Uganda Communications Commission. Current Status. The E-Waste Challenge

Télécharger la présentation

E Waste Management – Uganda’s Journey

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forum on Environmentally Sound Management of E-waste in Latin America Montevideo, Uruguay: 12 March, 2014 E Waste Management – Uganda’s Journey Smart Sustainable Cities - 2014 Dickson Kwesiga Uganda Communications Commission

  2. Current Status • The E-Waste Challenge • Knowledge, Attitudes & Perceptions • Policy and Legal Framework • Current Practices • Regulation at entry points • Regional Collaboration

  3. Current Practices

  4. Existing Facilities • Various Informal Recyclers • Uganda Cleaner Production Center • East African Compliant Recycling Facility (Nairobi) • WEEE Center (Nairobi, Kenya) • The E-waste Solutions Alliance for Africa (UK) – Pilot Project

  5. Subscriber Trends

  6. Key Challenges in Uganda • Rapidly increasing e-waste volumes • Limited studies about quantities of e-waste • Low level of awareness (& poor perceptions) among consumers • E-waste workers have little or no knowledge of toxins in e-waste

  7. Policy Strategies • Establishment of E-waste Management Infrastructure • Awareness and Education • Legal Framework • Human Resource Development • Resource Mobilization • E-Waste Fund

  8. Investments in Infrastructure • Carry out ongoing e-waste surveys and assessment of mass flows to inform e-waste management interventions • To establish and maintain a data base for imported and exported EEE • Initiate and implement pilot projects, for collection, recycling and treatment of e-waste • Facilitate formation of e-waste collection schemes through formalization, licensing & setting targets for each scheme • Provide training for e-waste scheme operators • Promote take- back systems with incentives for consumers • Promote EEE leasing for bulk consumers

  9. Investments in Infrastructure • Set up national modern dismantling and recovery facility in partnership with the private sector • Mainstream training in e-waste recovery and dismantling skills in technical institutions curriculum • Explore options for disposal of hazardous e-waste components, through treatment or sale to competent firms • Engage EEE producers and original equipment manufacturers (OEM) in strategic partnerships, including buy back systems, extended producer responsibility and setting up recovery and dismantling facilities. • Participate in regional and international fora on best e-waste management practices

  10. Ongoing Policy Implementation • Feasibility study to establish volumes of E-waste • An e-waste management strategy was drafted • Plans are underway for the establishment of a manual E-waste dismantling plant • In collaboration with the E-waste Solutions Alliance for Africa UK, a pilot is underway for establishment of an E-waste collection system

  11. Thank You DICKSON KWESIGA

More Related