1 / 19

Welcome to TPDZ

Welcome to TPDZ. Taicang City TPDZ TBLC Import Process Commodities & funds flow Cost of Labor force / office others. Taicang City. Taicang located at southeast ern tip of Jiangsu Province, It borders the Yangtze River on the east and neighbors Shanghai on the south.

Télécharger la présentation

Welcome to TPDZ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to TPDZ

  2. Taicang City • TPDZ • TBLC • Import Process • Commodities & funds flow • Cost of Labor force / office • others

  3. Taicang City • Taicang located at southeastern tip of Jiangsu Province, • It borders the Yangtze River on the east and neighbors Shanghai on the south. • It covers an area of 823 square kilometers, of which 649 square kilometers land area. • With registered permanent residents of 460,000. • Taicang is one of the most developed counties in China.

  4. 1.1 Favorable locations • Shanghai • 40KM from Hongqiao airport • 70KM from Pudong airport • 50KM from People’s square • Yangtze rive delta • 68KM from Suzhou • 88KM from Wuxi • Taicang is at the best junction of China 100KM 200KM

  5. 1.2 Fiscal revenue 2009 Ammount(RMB) Growth (2008) GDP 60.8Billon 15.2 % Fiscal revenue 13.83Billon 23.4 % 5.88Billon 17.18 % general budget revenue total socialinvestment in fixed assets 28.8Billon 16 % 150Billon 16 % gross industrial output value Added value of service industry 23Billon 18 % Taicang Ranks Top 10s countries for many years

  6. TPDZ (Taicang port development zone) TPDZ approved by Jiangsu Provincial People’s Government, was established in 1993, with a planned land area of 261 square km. Located at the south bank of Yangtze River Estuary, Taicang Port is the best joint for “River-and-Sea Coordinated Transport”. As a unique natural deep-water harbor, Taicang port owns a coastline of 38.8 kilometers long and 12.5 meters deep, which allows it to construct fourth and fifth generation container berth.As a first class national port, Taicang port has been listed as a main port for containers of the Shanghai International Navigation Center by the Ministry of Communications and National Development and Planning Committee.

  7. 2.1 Achievements of TPDZ Honor: • Most valuable investment park • Advanced Unit for Coastal Development in Jiangsu Province • The Industrial Park with Harmonized Labor Relations in Jiangsu Province • Advanced Unit for Open Economy in Suzhou City

  8. 2.2 Port advantages • The port owns 52 berths includes container, bulk cargo and petro-chemical berths. • There are 24 berths of 10,000tons capacity and total 77.71million tons planed capacity as well as 2.35milliom ETU capacity for container berths. • It has already built 200,000square meter warehouse, 1.9million square meters pile-yard, 1million cubic meter oil tank and many kinds of shore equipment 240sets. • Taicang port has established more than 70 sea routes domestic and overseas connect the area of Korea, Japan, Taiwan and east-Asia and so on. Container berthes Bulk Heavy Cargoes Petro-chemical

  9. 2.3 Road net • North-South • Taicang-SH Road • A5 • 204 National Road • SH-Nantong Railway • East-West • 339 Provincial Road • Sukuntai High way • Xingang Road • Wuxi-Taicang fist-class road Taicang-SH Road SH-Nantong Railway Wuxi-Taicang fist-class road Taicang-SH Road A5 204 National Road Taicang-SH Road • 15mins to approach the Highway in anywhere of TPDZ

  10. TBLC (Taicang Bonded Logistic Center) • 1.39 square kilometers • 550,000 square meters warehouses, • 160,000 square meters transfer pile-yard • 100,000 square meters bulk pile-yard • 1million EUT container cargo and 20million tons bulks • TBLC offers one-stop & one-package services • 24hrs and 365 days per year services. • Taxation drawback of domestic goods entered into TBLC (viewed as export) • Free assembly, transfer, simple process and storage without duration can be realized inTBLC

  11. 3.1.1 Sophisticated Facilities • Six individual warehouses cover a total area of 75,000㎡ with the additional 40,000㎡ parking lots. • Each warehouse is 150 meters in length, 72 meters in width and 12 meters in height.

  12. 3.1.2 Sophisticated Facilities • Total 18 electric sliding doors and 18 electric adjustable platforms at both sides of each warehouse. • 300㎡ offices at either end of each warehouse.

  13. 3.2 Diversified handling equipment

  14. 3.3 Monitor & insurance system • Being equipped with • fully automatic water spray, • lighting, • power supply, • telecommunications, • water supply & drainage, • CCTV monitoring systems. • The intelligent gatehouse, customs and quarantine inspection facilities

  15. Import Process

  16. 5.1Commodity process of the Port

  17. Cost of Labor force / office • The average salary of workers is 1500RMB/month • Office Rent :3500-4000RMB/month for 100Square meters • Four insurances: • endowment insurance : Company 19% ,individual 8% • unemployment insurance : company2%,individual 1% • Medical insurance: company 8%, individual 2% • Housing fund: company 8%/10%/12%, individual 8%,10%/12%

  18. Others

  19. THANK YOU

More Related