1 / 39

Regional Workshop on Measuring Progress of Societies

Regional Workshop on Measuring Progress of Societies. What Capacity Building do we need to measure Progress? Sanaa – Yemen , April 19, 2007 (Thierry Paccoud – Project Director – MEDSTAT II Lot 2. Outline of the presentation. MEDSTAT II in brief Foundations Objectives

irisa
Télécharger la présentation

Regional Workshop on Measuring Progress of Societies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Workshop on Measuring Progress of Societies What Capacity Building do we need to measure Progress? Sanaa – Yemen , April 19, 2007 (Thierry Paccoud – Project Director – MEDSTAT II Lot 2

  2. Outline of the presentation • MEDSTAT II in brief • Foundations • Objectives • Principles for intervention • Organization • Present status • Capacity strengthening • Human capacities • Technical capacities • Institutional capacities • MEDSTAT II contributions for capacity strengthening

  3. MEDSTAT II in brief • Foundations • Objectives • Principles for intervention • Organization • Present status

  4. Strong political foundations Policy and strategic framework of the EU-MED relations Barcelona initiative ENP Bilateral agreements with EC Common history with the EU member states

  5. Strong tehnical foundations Achievement from MEDSTAT I Methodologies Production of statistics Publications

  6. Objectives of MEDSTAT II Strengthening of the statistical systems Production of better Statistics Visibility of the statistical work and products

  7. Principles for implementing the project A country-tailored implementation process. A focus on production, dissemination and final use of statistics. A deep involvement of the NSSs of the MED countries. A more demand-driven approach. Capacity strengthening (ownership and durability).

  8. A complex project • 10 partner countries • 12 sectors of interventions • 16 LTE, Approximately 3400 days of STE • Extensive scope for the TA (Missions, Events..) • Complex institutional framework (DC, TF, WG)

  9. Organisation Lot 3 Equipment Consortium: Agmin • Lot 1 • Horizontal activities • IT • Training • Logistics • Consortium: GTZ(+Sogeti), Ariane II Groupe Transiciel (L), EIPA (NL), Meteksan Sistem A.S. (TQ), IBF (B), CNAM (FR), Statistics Lithuania (LT), Ministère de l’Economie (L) • Lot 2 • Thematic activities • Trans, Tour, En, Env, NA, Ext. trade, Agr, Soc, Migr • Consortium: ADETEF, INSEE (FR), INE (ES), INE (PT), ONS (UK), GUS (PL), KSH (HU), Plan Bleu (FR), Landsis (LU)

  10. The work program Inception phase Launching Phase Implementation Phase Completion Phase

  11. Activities planned Delivery of the Equipment • Activity 1: • Mission orientation reports • Road Maps Activity 2: Data collection and exchange Activity 3: Transfer of Know how Activity 4: Harmonization Activity 5: Programming and reorientation Activity 6: Synergies Activity 7: Dissemination of statistics Activity 8: Users’ needs

  12. Where do we stand today? Between the orientation and the implementation phases • Reports =} Directors’ Committee • Task forces =} Road maps

  13. Sector Work programme: an example for agriculture statistics

  14. National statistical development strategy- NSDS Road Map Country X MEDSTAT II Other interventions CSSR POR Sector x Regional orientations Activities at national, sub regional and regional levels Sector y Regional orientations Activities at national, sub regional and regional levels Sector Report X Orientation missions

  15. Capacity building 2. Technical capacities 1. Human capacities 3. Institutional capacities

  16. Human capacities Individual capacity Articulation of knowledge and know-how Collective memory/consistency 1. Human capacities

  17. Individual capacity • General training on statistics methods and tools • Recycling and re-training • Valorization Articulation of knowledge and know-how Collective memory/consistency

  18. Individual capacity Articulation of knowledge and know-how • Team/group work, • Vertical integration of activities • Horizontal integration of activities • Training capacities Collective memory/consistency

  19. Individual capacity Articulation of knowledge and know-how Collective memory/consistency • Inside the NSI • Inside the NSS • Outside the NSS

  20. Technical capacities Norms and standards – Know-why Tools – Know-what Practices – Know-how Network – Know-who and know-where 2. Technical capacities

  21. Norms and standards – Know-why • Methodologies • Systems • Classifications Tools – Know-what Practices – Know-how Network – Know-who and know-where

  22. Norms and standards – Know-why Tools – Know-what • Data collection • Data processing • Data production • Data analysis • Data dissemination Practices – Know-how Network – Know-who and know-where

  23. Norms and standards – Know-why Tools – Know-what Practices – Know-how • Understanding • Mastering (reproduction) • Adapting and improving Network – Know-who and know-where

  24. Norms and standards – Know-why Tools – Know-what Practices – Know-how Network – Know-who and know-where • Sector versus global level • National, regional and international

  25. Institutional capacities Within the NSI Between the NSI and its partners (production) Relation with the users National Statistical System (NSS) Community of statisticians

  26. Within the NSI • Organization and structure • Planning and programming • Archiving • Synergies and integration between/of activities Between the NSI and its partners (production) Relation with the users National Statistical System (NSS) Community of statisticians

  27. Within the NSI Between the NSI and its partners (production) • Exchange of information • Coordination of activities • Joint products (production, dissemination) Relation with the users National Statistical System (NSS) Community of statisticians

  28. Within the NSI Between the NSI and its partners (production) Relation with the users • Information • Communication • Perception of user’s needs • Feed-back to the users National Statistical System (NSS) Community of statisticians

  29. Within the NSI Between the NSI and its partners (production) Relation with the users National Statistical System (NSS) • Strategy (NSSD) • Organisation (statistical Council) • Programming (arbitrage) Community of statisticians

  30. Within the NSI Between the NSI and its partners (production) Relation with the users National Statistical System (NSS) Community of statisticians • Quality • Transparency • Visibility • Accessibility

  31. MEDSTAT II contributions for capacity strengthening • Equipment • Technical assistance (field missions, study visits, working groups…) • Training (workshops, training sessions, e-learning…) • Network of expertise • Visibility of and access to data (publications, common data-bank, web-site)

  32. Human capacities

  33. Technical capacities

  34. Institutional capacities(1)

  35. Institutional capacities (2)

  36. To conclude… (1) A regional project is only one possible perspective to contribute to capacity strengthening An articulation and synergies must be established with other levels: National and International

  37. To conclude… (2) Main contribution of regional support projects to capacity building in statistics: • Exchange of experiences and practices among partners with similar problems • Economy of scale for the development of tailored solutions/tools • Peer pressure

  38. To conclude… (3) Key contribution of a EU-funded regional project to capacity building in statistics: • Comprehensive and harmonized EU statistical system (methods and norms) • Strengthening of the EU-MED partnership and articulation with other themes/areas of co-operation • Long standing co-operation schemes with EU member states (bilateral)

  39. Thank you for your attention! Thierry Paccoud Project Director MEDSTAT II – Lot 2 Thierry.Paccoud@Medstat2.fr

More Related