An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pre-Meeting Meeting Brian Drendel 7-23-07

  2. Accelerator Shift Plot

  3. Users Shift Plot

  4. Current Store • Determine Store turn-around based on: • Decay Fit • Pbar Progress

  5. Luminosity Decay Projections • No store this morning….

  6. Luminosity + Pbar Projection • No store this morning…

  7. Issues for Today • Recycler Dampers. • Lower Initial Luminosities, but Pbar restriction lifted. • Tevatron, Pbar and Recycler issues. • Intensity Reductions next week.

  8. Intensity Reduction • Intensity reduction before the long shutdown:  In order to minimize the radiation exposure to the personnel working in the tunnel on our major Booster and Main Injector long shutdown jobs, we will be reducing beam loss levels in the Booster and Main Injector the week before the long shutdown. We are currently running ~11-12 turns with a power loss of ~500 Watts in Booster.  • Step 1: Six days in advance of the long shutdown (08:00, July 30th), we will implement Booster power loss limits • Booster power loss limit is ~200 Watts, and no more than 50% of the trip level. • Cut the Main Injector power losses in half at I:LI522A and I:LI305A. • Early tests show that going down 2 turns meets this requirement with 4e12/pulse, and a stack rate of 16-17mA/hr. • Early test suggest that we may be able to stack as much as 16-17e10/hr. • NuMI will be off. • The remaining beam will be sent to MiniBooNE and SY120. • Step 2: Four days in advance of the long shutdown (08:00, August 2nd), we will implement Both Booster and Main Injector power loss limits. • Booster power loss limit of ~200 Watts, and no more than 50% of the trip level. • Main Injector power loss limit of ~140W (330KJ for a 2.4 second cycle time). • Early tests show that 9 Booster turns will meet this requirement with 3.3e12 per pulse, and a stack rate of 14-15mA/hr. • User Priority:  If there are questions on how to divide the beam, the priority levels are • Collider Program • Neutrino Program (NuMI is off) • SY120

  9. Accelerator Conditions • Linac • Booster • Pbar • Recycler • Main Injector • Tevatron • NuMI • MiniBooNE • SY120

  10. Linac Status

  11. Booster Status

  12. MI-8 Emittances on $14

  13. MI Efficiency (Stacking)

  14. Pbar Check

  15. Recycler Check

  16. Ecool Check

  17. MiniBooNE Check

  18. SY120 Check

  19. Tevatron Data • Pbars • Pbars vs Initial Luminosity • Intensities • Transverse Emittances • Longitudinal Emittances • Tunes • Protons • P*Pbars vs Luminosity • Intensities • Transverse Emittances (soon) • Longitudinal (soon) • Tunes

  20. Pbars

  21. SVG Pbar Intensities • SVG website did not update for this store…

  22. SVG Proton Horizontal Emittance • SVG website did not update for this store…

  23. SVG Proton Vertical Emittance • SVG website did not update for this store…

  24. SVG Pbar Longitudinal Emittance • SVG website did not update for this store…

  25. tunes

  26. Protons

  27. SVG Proton Intensities • SVG website did not update for this store…

  28. SVG Proton Horizontal Emittances • SVG website did not update for this store…

  29. SVG Proton Vertical Emittances • SVG website did not update for this store…

  30. SVG Proton Longitudinal Emittances

  31. FY’07 Integrated • Plots did not update

  32. Weekly Integrated