1 / 2

Design Process for Product or Service

QUOTE or NoGo. GO / NoGo. CUSTOMER. PLANNING Quote Review. Customer RFQ or Internal Request. Planning Interface Cross Dept Interactions Go / NoGo decisions. plan interface. Sales Clarifications. AUTHORIZATION TO WORK & Quote Router (QO2) / Rqmts. 1. INPUT REQUIREMENTS

ita
Télécharger la présentation

Design Process for Product or Service

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QUOTE or NoGo GO / NoGo CUSTOMER PLANNING Quote Review Customer RFQ or Internal Request Planning Interface Cross Dept Interactions Go / NoGo decisions plan interface Sales Clarifications AUTHORIZATION TO WORK & Quote Router (QO2) / Rqmts 1 INPUT REQUIREMENTS complete & unambiguous Technical Rqmts & Clarifications Design Processfor Product or Service preliminary recommendations Tech License Review Technical Inputs CAD / Part Availability Requirements Authority to Proceed 2 DESIGN / APPROVAL PLAN key suppliers design plan acceptance criteria potential issues Technical Research Suppliers Mating Designs / Parts Single Source Parts Purchase Parts CAD Models Technical Confirmation Technical Reviews Design / analysis criteria Authority to Proceed 3 ENGINEERING DESIGN cost / producibility Pro/E Models, Drawings, Analysis, Critical Characteristics Engr Design Validation & Approval Bill-of-Material Engr Drawings Authority to Proceed 4 MANUFACTURING PLAN MfgrRouter BOM & Build Operations Mfgr Router (RT1) END 09-26-13 GR-01-7020_13b00

  2. QUOTE or NoGo PLANNING Quote Review CUSTOMER Customer RFQ or Internal Request Status & Updated Quote Router AUTHORIZATION TO WORK Quote Router to Track 1 Technical Requirements & Clarifications INPUT REQUIREMENTS complete & unambiguous Design Processfor Product or Service 3 • DESIGN REVIEWS (as-req’d) • Issue Findings / Actions • review – design plan • verify - design meets input rqmts • price & producibility (Go/NoGo) • validate – functional stability • ex: cad analysis REQUIREMENTS Clarifications 2 Design Reviews Acceptance Criteria • OUTPUT DESIGN • 2a) Review Plan ……… • 2b) Engineering Design • 2c) Manufacturing Plan • design to requirements • cost, production, service • acceptance criteria • critical characteristics cross functional reviews & direction Design Revisions Engineering & Manufacturing DESIGN Pro/E Models, Drawings, Analysis Mfgr Router BOM & Build Operations 09-13-13 GR-01-7020_13a00

More Related