1 / 18

PRJ480 Mastering the Management of Iterative Development v2

PRJ480 Mastering the Management of Iterative Development v2. Module 5: Phase Management - Construction. Module 5 Objectives. As a project progresses through phases and iterations, Describe the changing emphasis of Project Management by:

Télécharger la présentation

PRJ480 Mastering the Management of Iterative Development v2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRJ480 Mastering the Management of Iterative Development v2 Module 5: Phase Management - Construction

  2. Module 5 Objectives As a project progresses through phases and iterations, Describe the changing emphasis of Project Management by: • Understanding Construction objectives, milestones, and evaluation criteria. • Understanding principal Construction activities and artifacts and their uses. • Discussing team considerations regarding building the product.

  3. Construction Primary Objectives: • Minimizing development costs by optimizing resources and avoiding unnecessary scrap and rework • Achieving adequate quality as rapidly as practical • Achieving useful versions (alpha, beta, and other test releases) as rapidly as practical Essential Activities: • Resource management, control, and process optimization • Complete component development and testing against evaluation criteria • Assessment of product releases against acceptance criteria of the vision

  4. Entering Construction • Major project risks have been mitigated, and the architecture is established on a firm foundation during Elaboration. • The tone of the project changes from engineering to production. • You know what you need to do (most of the invention was achieved and uncertainties were removed). • Staffing is increased. • Planning is aimed at efficiency and quality.

  5. Construction Considerations • Phase Focus • Resource management control and process optimization • Complete component development • Assess product against acceptance criteria and vision

  6. Construction Considerations • Measurements • Progress 90% • Expenditures (rate) High • Staffing Steady • Stability Moderate • Modularity <25% • Adaptability Benign • Maturity Usable

  7. Rework in the Iterative Lifecycle Extensive rework during Construction is avoided through solidifying the architecture in the Elaboration phase. • Too much rework • Gold plating • Unstable requirements • Not enough focus on cost and schedule • Too little rework • Excessive schedule pressure • Poor quality testing • Perception of rework as incompetence or failure

  8. 100 75 50 25 Rework Trends Rework (% of total) Rework after architectural baseline should total <= 25% of the system Inception Elaboration Construction Transition

  9. Importance of Testing: A Manager’s Perspective • Tests represent a part of the exit criteria for phases. • Tests provide some risk mitigation. • Tests of executable code provide quantifiable progress. • Test results provide quality measurements.

  10. Test Each Iteration: Functionality and Performance Iteration 1 Iteration 2 Iteration 3 Iteration 4 Test Suite 1 Test Suite 2 Test Suite 3 Test Suite 4 Tests

  11. Construction Essential Artifacts • The System • Deployment Plan • Implementation Model (and all constituent artifacts, including Implementation Elements) • Test Suite ("smoke test") • User Support Material • Iteration Plan • Design Model (and all constituent artifacts) • Development Process • Development Infrastructure • Data Model

  12. Construction% Management 10 Environment/CM 5 Requirements 8 Design 16 Implementation 34 Assessment 24 Deployment 3 Total 100 RUP Distribution of Skills by Phase Percentage of effort by activity for the Construction phase.

  13. Construction Evaluation Criteria • Is this product baseline mature enough to be deployed in the user community? • Is this product baseline stable enough to be deployed in the user community? • Are the collateral artifacts ready for transition to the user community? • Are actual resource expenditures versus planned expenditures acceptable?

  14. Construction Phase Management Issues • Project not converging • Forgetting about new risks

  15. Construction Phase Recommendations • Each release provides: • A sense of accomplishment to developers • A point of control to managers • Reassurance to customers and other stakeholders • Never throw a release at a customer without preparation • Set expectations • Spend time with the customer • Adhere to the release schedule, shifting functionality rather than schedules • But beware of the snowplow effect, where everything gets pushed to the end of the schedule

  16. Discussion: Characteristics of Construction • What are expected characteristics of the project during Construction? • What are activities that need emphasis during Construction?

  17. Module 5 Review • The main objective of Construction is to build the product. • Avoid rework by solidifying architecture in Elaboration • Never throw a release at a customer without preparation • Test each iteration for functionality and performance • Essential artifacts are: • The system • Iteration Plan/Assessment

More Related