SURVIVING A CUPA INSPECTION 2008

SURVIVING A CUPA INSPECTION 2008. MFASC CONTINUING EDUCATION MOORE COMPLIANCE & TRAINING, INC. HAZARDOUS MATERIALS MANAGEMENT PROGRAM. UNIFIED PROGRAM FACILITY PERMIT Current CUPA permit is on-site. Avoid late fees. Renewal information is mailed out two months before the fees are due.

ivi
Télécharger la présentation

SURVIVING A CUPA INSPECTION 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SURVIVING A CUPA INSPECTION2008 MFASC CONTINUING EDUCATION MOORE COMPLIANCE & TRAINING, INC.

  2. HAZARDOUS MATERIALS MANAGEMENT PROGRAM • UNIFIED PROGRAM FACILITY PERMIT • Current CUPA permit is on-site. • Avoid late fees. Renewal information is mailed out two months before the fees are due.

  3. HAZARDOUS MATERIALS MANAGEMENT PROGRAM • RECORD KEEPING • Hazardous Materials Business Plan • Consolidated Contingency Plan • Hazardous Material Chemical Inventory • Current and up to date? • Emergency Coordinator Information • Current and up to date?

  4. HAZARDOUS MATERIALS MANAGEMENT PROGRAM • RELEASE REPORTING • Immediate Notification • Procedures for mitigation • Evacuation plans and procedures • Employee training plan

  5. HAZARDOUS WASTE GENERATOR REQUIREMENTS • HAZARDOUS WASTE DETERMINATION • Waste stream characteristic.

  6. HAZARDOUS WASTE GENERATOR REQUIREMENTS • IDENTIFICATION NUMBER • EPA ID Number- Do you have the correct type of number (prefix)? • CAL • CAD • CAR

  7. HAZARDOUS WASTE GENERATOR REQUIREMENTS • DISPOSAL, TREATMENT & TRANSPORTATION • Hazardous waste going to a “permitted” facility? • Being treated onsite? • Got a Tiered Permit? • Hazardous waste being transported by a registered hazardous waste transporter?

  8. HAZARDOUS WASTE GENERATOR REQUIREMENTS • STORAGE • 90 days for on-site hazardous waste in tanks or containers (LQG). • 180/270 days for on-site hazardous waste in tanks or containers. (SQG) • 1 year or 55 gallons for satellite accumulation.

  9. HAZARDOUS WASTE GENERATOR REQUIREMENTS • STORAGE • Discontinue storage of hazardous waste in anything other than containers, tanks, drip pads, or containment buildings.

  10. HAZARDOUS WASTE GENERATOR REQUIREMENTS • USE AND MANAGEMENT OF CONTAINERS • Leaking or in poor condition. • Incompatible storage. • Containers kept closed. • Handling of containers. • Weekly inspections. • Store hazardous materials in undamaged containers or manage as hazardous waste.

  11. HAZARDOUS WASTE GENERATOR REQUIREMENTS • CONTAMINATED CONTAINERS • Mark containers or inner liners greater than 5 gallons with: The Date Emptied and suggest the word “EMPTY”. • Manage within 1 year. • Put into use • Recycle/reclaim • Sent off as hazardous waste

  12. HAZARDOUS WASTE GENERATOR REQUIREMENTS • LABELING AND MARKING REQUIREMENTS • Each container and tank of hazardous waste: • Accumulation start date. (First drop) • “Hazardous Waste” • Contents, physical state, hazardous properties, generator name and address.

  13. HAZARDOUS WASTE GENERATOR REQUIREMENTS • LABELING AND MARKING REQUIREMENTS • Label hazardous materials container properly or handle as a hazardous waste.

  14. HAZARDOUS WASTE GENERATOR REQUIREMENTS • TANKS • Integrity assessment certification. • Secondary containment. • Ignitable or reactive wastes. • Daily tank inspections. • Closure.

  15. HAZARDOUS WASTE GENERATOR REQUIREMENTS • PREPAREDNESS & PREVENTION • Maintain site to minimize possibility of fire, explosion, unplanned release of hazardous waste to environment. • Equip site with: • Internal and external communication system. • Fire, spill control and/or decon equipment and test them. • Maintain adequate aisle space. • Familiarize local response agencies.

  16. HAZARDOUS WASTE GENERATOR REQUIREMENTS • DOCUMENT REVIEW • Hazardous Waste Manifest System • Mail legible copy to DTSC within 30 days. • Maintain records for at least 3 years.

  17. HAZARDOUS WASTE GENERATOR REQUIREMENTS • LAND DISPOSAL (LDR) RESTRICTIONS • Maintain records of all LDR paper work.

  18. HAZARDOUS WASTE GENERATOR REQUIREMENTS • RECORDKEEPING & REPORTING • Retain waste analysis test records for 3 years. • Retain a copy of Biennial Report. • Submit a Biennial Report by 3/1 (every even numbered years) for odd numbered years to DTSC. • Report release incidents to CUPA.

  19. HAZARDOUS WASTE GENERATOR REQUIREMENTS • CONTINGENCY PLAN & EMERGENCY PROCEDURES • Maintain a contingency plan. • Implement contingency plan when needed. • Describe actions needed to respond to an emergency. • Identify emergency coordinators.

  20. HAZARDOUS WASTE GENERATOR REQUIREMENTS • CONTINGENCY PLAN: • Evacuation plan. • CUPA & OES telephone numbers. • List of emergency equipment and location. • Copy submitted to CUPA. • Maintain/updated as needed. • Maintain emergency coordinator on site or on call at all times.

  21. HAZARDOUS WASTE GENERATOR REQUIREMENTS • PERSONNEL TRAINING • Training program directed by a qualified hazardous waste person. • Provide training program in hazardous waste procedures. • Ensure all personnel are trained . • Provide annual refresher training. • Maintain training records for 3 years.

  22. HAZARDOUS WASTE GENERATOR REQUIREMENTS • SOURCE REDUCTION • Completed SB14 plan available. • What make up a completed plan? • Required reports filed with DTSC.

  23. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • FACILITY NOTIFICATION REQUIREMENTS • Submit “Onsite Hazardous Waste Treatment Form” • Submit “Onsite Hazardous Waste Treatment Facility Information Plan”. • Plot Plan. • Amended notification within 30 days. • Notify CUPA of closure 15 days before.

  24. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • GENERAL REQUIREMENTS (PBR, CA & CE) • Manage hazardous waste per regulations. • Treat only wastes generated on-site. • Restrict type and volume per permit level. Concentration of hazardous waste. • Inspection schedule – 3 years. • Pretreatment standards. • Proper closure.

  25. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • CA AND PBR • Control all entry points and post warning signs. • Provide containment system. • Maintain containment system. • Annual hazardous waste minimization certification. • Phase I environmental assessment.

  26. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • CA AND PBR • Financial assurance for closure. • Annual adjustment of closure cost. • Submit information about releases.

  27. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • PBR • Mark exterior of each treatment unit. • Develop/maintain Waste Analysis Plan. • Repeat analysis to stay up to date. • Maintain Operating Records. • Submit annual report when requested. • Maintain Written Closure Plan.

  28. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • RECYCLING EXEMPTION AND EXCLUSION REQUIREMENTS • Document claim for exemptions or exclusion for recycling. • Label containers “Excluded Recyclable Materials”. • Report to CUPA every 2 years status of recycling.

  29. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • Treat only hazardous waste which are generated onsite. • Restrict hazardous waste treatment to those wastes, volumes and processes authorized for the reported treatment tier. • Treatment of Aqueous Cyanide Waste is now part of PBR. “Consent Decree” is now history. • Manage residual properly.

  30. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • Prepare and maintain written operating instructions. • Maintain a written operating log of: • Dates • Amounts • Hazardous constituents • Types of waste treated • Residual management

  31. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • Maintain a written inspection schedule. • Records shall include: • Date & time of inspection • Name of inspector • Notation of observations made • Date and nature of any repairs or other actions • Records shall be maintained for three years.

  32. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • Maintain adequate records to demonstrate that the facility is in compliance will all pretreatment standards and applicable industrial waste discharge requirements issued by the POTW. • Upon closure, remove or decon any residue, equipment or soil.

  33. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM Notify your local CUPA of any changes in your fixed treatment unit within 30 days of changes.

  34. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • CA and PBR • Control all entry points to waste treatment area at the facility and post a sign at each entrance: • “Danger -- Hazardous Waste Area -- Unauthorized Personnel Keep Out” • Post a “No Smoking” sign where there is a hazard from ignitable or reactive waste.

  35. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • CA and PBR …..continued • Provide containment systems for hazardous waste treatment, transfer and storage areas. • Retain onsite the written assessment, certifies by a registered professional engineer, that the secondary containment systems has sufficient structural integrity.

  36. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • CA and PBR…..continued • Maintain the containment system. • Maintain an annual hazardous minimization certification. • Provide financial assurance for closure. • Adjust the closure cost estimate for inflation by March of each year.

  37. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • CA and PBR ….. Continued • Conduct a Phase I environmental assessment. • Submit updated information, subsequent to the submission of the Phase I assessment. • Maintain documents of any environmental investigation, judgments, etc.

  38. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • PBR • Permanently mark the exterior of each treatment unit with the name of the person who owns or operates the unit, facility ID number and serial number. • Develop and maintain onsite a written waste analysis plan for treatment of hazardous waste.

  39. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • PBR….Waste Analysis Plan • The waste analysis plan shall specify: • Detailed chemical and physical analysis of a representative sample of the waste to be treated. • Parameters for each hazardous waste to be analyzed. • Test methods which will be used. • Sampling and sampling management methods to be used. • Frequency of analysis and reanalysis of hazardous waste.

  40. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • PBR….Operating Records • Prepare and maintain an Operating Record with the following: • Description, quantity, methods and dates of all hazardous waste treated. • Results of waste analysis. • Summary reports and details of all incidents that require implementing the Contingency Plan.

  41. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • PBR…continued • Prepare and submit an annual report to DTSC and/or local CUPA when requested. • Prepare and maintain a detailed closure plan for each unit, including steps needed to decontaminate each unit and a schedule for the process.

  42. ON-SITE HAZARDOUS WASTE TREATMENT PROGRAM • Secondary containment area to be dry. • Aqueous Cyanide Waste Treatment • Consent Decree for Cyanide treatment is no more. • Secondary Containment & System Certification by PE. • CUPA now has a guidance document for this certification. • All piping to treatment area is covered.

  43. And the crowd went wild…… Permit by rule for treatment of aqueous waste containing cyanides

  44. Cyanide-Containing Wastes • Aqueous wastes generated by the rinsing of parts, racks, etc. • Aqueous waste from RO units. • Aqueous waste generated from rinsing of equipment. • Aqueous wastes from on-site recycling – rinsing of anode bags – empty containers. • Spent process solution.

  45. Authorized Treatment Processes • Oxidation with Hypochlorite. • Oxidation with Peroxide or Ozone. • Alkaline Chlorination. • Electrochemical Oxidation. • Ion Exchange. OR • Reverse Osmosis.

  46. Reduction of Cyanide Wastes • As Specified: • Holding time between tanks • Drag out tanks, dead rinses, countercurrent rinse tanks, etc. • At lease every four years review use of cyanide and evaluate if there are any non-cyanide solutions available. • May be part of the SB 14 report.

  47. Employee Training • Initial & Annual Training: • Reduce drag-out. • Minimize contamination. • Extend bath life. • Minimization of chemical spills and splashes. • Response to chemical spills.

  48. Non-aqueous Cyanide Wastes Thou shall not treat non-aqueous hazardous waste containing cyanide.

  49. Metal Recovery • Process solutions may be treated to reclaim metals by electrowinning.

  50. Spent Process Solutions • May be treated by slow addition to the aqueous waste streams already mentioned. • Concentration shall not exceed 5000 ppm of total cyanide.