1 / 8

Agenda Points

Agenda Points . Managements items Integration, Interface specifications + beam pipe Grounding plans Documentation – storage control Preparation for TDR, WBS near term plans. Management. Meetings- can this be more efficient, fewer? Meeting , review schedule, next meeting

ivory
Télécharger la présentation

Agenda Points

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda Points • Managements items • Integration, Interface specifications + beam pipe • Grounding plans • Documentation – storage control • Preparation for TDR, WBS near term plans

  2. Management • Meetings- can this be more efficient, fewer? • Meeting , review schedule, next meeting • Discussion on CD-1 report.

  3. Weekly Meeting structure • Tuesday tc-meeting 1.30 – FV/HGR • Management. Brief technical updates. Critical issues • Tc-team • Wednesday 1.00: integration- FV • Models, beam pipe, specifications (HFT/FGT interface). • Thursday: 1.00 Hardware HM • Detailed progress on PXL, IST • Friday: 1.30 Software SM • Wednesday SSD: 11.00 HM/MLV • Includes contact to Nantes. Bi-weekly

  4. MeetingsDocument preparation • Interface specification, March 24 Before CD-2 we need design review for baseline design, cost and schedule. It may be advantageous to have some of these split up.

  5. Integration specification • Let discuss the proposed format from Leo/Eric. • What is overall needed? • Identify lead person. • Set goals for drafts, completion. • I like the scroud+biasing to be documented (not presented), and have a final review.

  6. Grounding plans • Let us present here what has been done some far. • How can this information be gathered in a document. • Gather information, have review with Ciro, Gerard (of documents first) to find problems

  7. Documentation • Adepts for models? How are these tracked? Change control? • How can these be indexed reasonably. • Leo,Jow are setting up a svn server for PXL electric; Specification of these documents. Change control? • Project CD docs will be with KM,FV in final and controlled form. • Other documents reports, detector specification. • Drupal (exclude non star people (ICHP, Nantes..) • Web pages; control, backup an issue.

  8. Near term plan • Complete physics response!!

More Related