1 / 5

F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 541

F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 541. Replacement of the River Pump Station for Cameron County Irrigation District No. 6 in Texas. Resolution on certification ( INGLES / ESPAÑOL ) PROJECT CERTIFICATION DOCUMENT (PCD) ( INGLES / ESPAÑOL )

jagger
Télécharger la présentation

F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 541

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 541

  2. Replacement of the River Pump Station for Cameron County Irrigation District No. 6 in Texas Resolution on certification (INGLES / ESPAÑOL) PROJECT CERTIFICATION DOCUMENT (PCD) (INGLES / ESPAÑOL) *General Information *Human Health and Environment *Technical feasibility *Financial Feasibility *Community Participation *Sustainable Development

  3. Final Design – Proyecto ejecutivo

  4. Planning Documents Project calendar Plano Proposed vertical turbine profile Topographic survey of a proposed pump station site Water allocation rules and regulations of the Cameron County Proposed improvements layout Pumping plan project plan Pumping plan rehabilitation / replacement and conveyance system operation analysis

  5. Proceso Ambiental (México)

More Related